AI Assistant
Notifications
Clear all

Monitoring a 200 year old dry laid stone wall for movement

17 Posts
16 Users
0 Reactions
962 Views
muncle56
(@muncle56)
Posts: 14
Free
Topic starter
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

I've been tasked with monitoring this stone wall for movement (see photos).?ÿ Wall is almost 200 years old and about 7'-8' high.?ÿ I've been told it's probably 3' thick at the bottom.

Anybody have any experience in this sort of thing??ÿ Any suggestions on how to go about it?

?ÿ

?ÿ


 
Posted : January 25, 2021 3:04 pm
bill93
(@bill93)
Posts: 10001
Member P&R, Founder
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

That looks like a job for a scanner, since the wall might not move as a unit and you don't know how many reference points you need.?ÿ You might need to set some nails in there for future horiz/vertical alignment of the images.


 
Posted : January 25, 2021 3:15 pm
lurker
(@lurker)
Posts: 1169
Member Founder
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Start with a robust control baseline/network so you can prove your control is not moving. Then move to collecting data on the wall. A baseline with 3 points on line between the 2 end points and then a couple of angle checks for example. Steeples or antenna towers work well. Targets affixed or otherwise physically a part of the wall allow for the repeated measurements. Do you measure every stone with a scanner or do you identify individual points of interest? The more you can keep everything the same (equipment, procedures, observation points) the better.


 
Posted : January 25, 2021 3:41 pm
Hama75
(@paul-landau)
Posts: 234
Free
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Bill and Lurker have some great ideas. ?ÿIƒ??m curious as to the reason for this? Whatƒ??s the time frame? Be sure to budget accordingly ???ý


 
Posted : January 25, 2021 3:51 pm
john-hamilton
(@john-hamilton)
Posts: 3465
Member P&R, Founder
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Scan it. Software will show differences between scans.?ÿ


 
Posted : January 25, 2021 4:20 pm

holy-cow
(@holy-cow)
Posts: 25990
Member P&R, Founder
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

That's a lot of potentially moving parts.?ÿ I know very little about scanning, but that would seem to be the way to go.?ÿ Otherwise, you might set a hundred check points per a certain length of the wall.?ÿ That's a huge amount of data to compare manually and one heck of a lot of shots from a very solid set up using the same equipment every time.


 
Posted : January 25, 2021 4:32 pm
Joe
 Joe
(@one-cup-o-joe)
Posts: 240
Member Founder
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Just based on your first photo, I would say YES, it is moving.

I know this doesn't help with your question. It really depends on what equipment you have available.


 
Posted : January 25, 2021 4:54 pm
Williwaw
(@williwaw)
Posts: 3643
Member P&R, Founder
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

I don't think you will find the rate that it is moving at to be constant but rather a function of the degree of water saturation of the retained soils as the weight bears down on the wall. In other words when dry there's very little to no movement but following a prolonged rain event the movement accelerates with the increased load and soil lubrication.?ÿ


Just because I'm paranoid, doesn't mean they aren't out to get me.

 
Posted : January 25, 2021 6:02 pm
party-chef
(@party-chef)
Posts: 988
Free
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

The scope needs more definition.

The best approach is to measure it with the equipment and procedures you are comfortable with and report accordingly. Keep it simple and repeatable and do not report anything beyond what you can measure.

Doubt there is enough work there to learn too many new tricks.


 
Posted : January 25, 2021 7:23 pm
RADAR
(@dougie)
Posts: 7880
Free
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

If you don't have access to a scanner; I would place targets, at strategic locations and measure those at standard intervals from solid control. Report your findings in a spread sheet, created in excel. What they do with the data, is up to them.


 
Posted : January 25, 2021 7:33 pm

thebionicman
(@thebionicman)
Posts: 4529
Free
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

A lot depends on the type and magnitude of movement you are trying to observe. A scanner may be the ticket, or it may be massive overkill.

Once you answer those questions do two things.

1. Screw it up exactly the same way every time you observe.

2. Report it in a format meaningful to the client. Most clients have no use for a coordinate table. They need to quantify movement of a structure relative to a feature.

Hope that helps, Tom


 
Posted : January 25, 2021 8:48 pm
hpalmer
(@hpalmer)
Posts: 509
Member P&R, Founder
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

What is purpose of monitoring?

has 200yo wall suddenly moved?

does client have structural engineer on board.?ÿ

?ÿ

?ÿ

?ÿ


 
Posted : January 25, 2021 9:25 pm
flyin-solo
(@flyin-solo)
Posts: 1676
Free
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Done this exact thing on a newly built overpass that was suspected to be bulging. And yes- it was scanned (this was in 2003!). Every week for 2 months.?ÿ

We determined it was indeed moving and the whole thing got rebuilt.

Also did movement monitoring on the governorƒ??s mansion after it was nearly burned down about 10 years ago (all kinds of stories about that one). But it was way fewer data points, and we just used targets fastened to different parts of the building, shot conventionally.


 
Posted : January 25, 2021 9:35 pm
chris-mills
(@chris-mills)
Posts: 715
Free
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

As others have said, whatever way you do it you MUST have immovable reference points somewhere.

Depending upon how long between surveys and how much movement is expected, if scanning you might need to sweep off all the leaf clutter which collects between the stones - if the movement is small or intermittent it does make a difference. Stones can "roll" in the wall (see near the trees growing out of it) and leaf clutter can disguise that.

In dry weather the wall might move back as the ground behind dries out - I've had that happen, especially where the top of the wall is leaning back as this one does: then the upper stones might settle rather than move in x,y.

If you put targets on the wall, make sure they can't come off - small paint dots might well do. On the size of the wall shown it isn't going to take long to observe individual points - record in co-ordinate mode, drop into a spreadsheet and the office work is minutes. "Contouring" the face in x,z with y values as the contours will show up what is happening very quickly


 
Posted : January 26, 2021 4:05 am
holy-cow
(@holy-cow)
Posts: 25990
Member P&R, Founder
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

What is the total length involved and what is the potential loss if the wall failed completely?


 
Posted : January 26, 2021 8:10 am

Tom Wilson
(@tom-wilson)
Posts: 431
Free
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Sounds like maybe there is nearby construction that requires proof that adjacent infrastructure is not damaged. Around here our walls move all by themselves, stones rolling off the top as they heave with the winter frost and spring thaws.

Good luck with your project.

?ÿ

T.W.


 
Posted : January 26, 2021 10:30 am
paul-d
(@paul-d)
Posts: 488
Free
Translate ▼
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

I worked on something similar but it was for a coastal gun istallation from WWI. They knew it was moving, but didn't know where, by how much, or if reinforcing that had been installed had stopped the movement. We had a structural engineer identify areas of concern for different movement, installed prisims on the structure where we needed, then measured the points twice a week for a a month to get the average. We then monitored the locations every six months and reported the deviations from the original measurements. Our control was in bedrock, so was quite stable.

If I had access to a scanner at the time it would have been a superior method.


 
Posted : January 27, 2021 11:20 am