I just got a call from an engineer requesting an as-built ALTA survey on a 15 acre site where we had prepared an ALTA two years ago, which showed a lot of proposed access roads and structures.?ÿ

He wanted the new ALTA in exactly one week.?ÿ After I'd looked up our prior work, I told him that we couldn't do it, since everything was proposed the last time we were there, and it'd all been built now.

His words:?ÿ "Well, I don't see why not, since it's my understanding that an as-built doesn't require you to go to the site, it's just office and computer work"

I then explained what "as-built" means

 
Posted : December 6, 2022 10:58 am
nate-the-surveyor
(@nate-the-surveyor)
Posts: 10535
Member
 

Whatsamatterwichyou? You should have anticipated his need, and had it done yesterday. For $1000 dollars, for the fast service!!

Ha ha ha

 
Posted : December 6, 2022 11:11 am
MightyMoe
(@mightymoe)
Posts: 10135
Member
 

ALTA, also known as take on all the liability for everything we can throw at you and you're willing to accept.?ÿ

 
Posted : December 6, 2022 11:36 am
Scrim
(@scrim)
Posts: 64
Member
 

"All you gota do is...."

?ÿ

 
Posted : December 6, 2022 12:15 pm
Norman_Oklahoma
(@norman-oklahoma)
Posts: 7875
Member
 

His words:?ÿ "Well, I don't see why not, since it's my understanding that an as-built doesn't require you to go to the site, it's just office and computer work"

In his defense, this isn't the first time I've heard this thinking coming from an engineer. Not by a long shot.?ÿ

 
Posted : December 6, 2022 12:30 pm

Williwaw
(@williwaw)
Posts: 3455
Member
 

As-built has two different meanings to a surveyor and an engineer. To him it's a red stamp on the plans that show any mark ups where an inspector documented any deviations from the original plans, but in our case it involves actual measurements of all of the improvements. Same name, two very different things.?ÿ

Just because I'm paranoid, doesn't mean they aren't out to get me.

 
Posted : December 6, 2022 12:33 pm
jph
 jph
(@jph)
Posts: 2332
Member
Topic starter
 

@norman-oklahoma?ÿ

I wish that surprised me more

 
Posted : December 6, 2022 12:49 pm
Ric-Moore
(@ric-moore)
Posts: 841
Member
 

His words:?ÿ "Well, I don't see why not, since it's my understanding that an as-built doesn't require you to go to the site, it's just office and computer work"

In his defense, this isn't the first time I've heard this thinking coming from an engineer. Not by a long shot.?ÿ

That's a defense?

?ÿ

 
Posted : December 6, 2022 12:52 pm
nate-the-surveyor
(@nate-the-surveyor)
Posts: 10535
Member
 

@JPH

"Another Category: Dumb Stuff you hear"

Do we really need a category for this? Why cant we just use "Surveying and Geomatics"? (There is a nice load of funny stuff there already!!)

I'm really laughing at your story. Engineers are so notorious for such gaffs.

And, I am also slightly miffed that the engineer had to cahones to ask for such a thing.

Keep em coming!

Say, do you know how to offend an engineer? I asked a train engineer how many times his train had derailed. He said, ƒ??I'm not sure, it's hard to keep trackƒ?.

N

 
Posted : December 6, 2022 1:26 pm
squirl
(@squirl)
Posts: 1217
Member
 

"The only thing left to do is everything!"

I've been asked for an as-built and the requester just wanted me to use our field calculations as the as-built information when they had clearly changed curb and sidewalk placement from the locations we had staked.

T. Nelson - SAM

 
Posted : December 6, 2022 1:31 pm

Andy Bruner
(@andy-bruner)
Posts: 2758
Member
 

As-built has two different meanings to a surveyor and an engineer. To him it's a red stamp on the plans that show any mark ups where an inspector documented any deviations from the original plans, but in our case it involves actual measurements of all of the improvements. Same name, two very different things.?ÿ

When I ran the surveying department of an engineering firm we did not use the term "As Builts".?ÿ We used the term "Record Drawings", and all the dimensions (if different from the contract drawings) were supplied by the contractor.

I only placed my engineer's seal on two sets of drawings.?ÿ One of which was an "As Built" (different engineering company).?ÿ The client a LARGE City had it in the contract that As Builts would be stamped by an engineer, even though all the measurements and drafting was done by the surveying department.?ÿ Since I had both licenses my stamp was used.

Andy

?ÿ

 
Posted : December 6, 2022 2:30 pm
FL/GA PLS
(@flga-pls)
Posts: 7403
Member
 

$1000 dollars, for the fast service!!

C'mon Natester $1000 is really gouging, $250 is more like it. ?????ÿ

 
Posted : December 6, 2022 2:44 pm
thebionicman
(@thebionicman)
Posts: 4505
Member
 

If we are going to do, "dumb stuff you hear", then we should also have, "dumb stuff we say"...

 
Posted : December 6, 2022 2:55 pm
FL/GA PLS
(@flga-pls)
Posts: 7403
Member
 

If we are going to do, "dumb stuff you hear", then we should also have, "dumb stuff we say"...

might as well add "dumb stuff we do" (but won't admit it) ?????ÿ

?ÿ

 
Posted : December 6, 2022 2:58 pm
RADAR
(@dougie)
Posts: 7882
Member
 

That's a defense?

A lot of other engineers are as ignorant as this guy, so give him a pass...


GIF
 
Posted : December 6, 2022 3:11 pm

holy-cow
(@holy-cow)
Posts: 25372
Member
 

Where do you buy dumb stuff.?ÿ At Dumm Stuf Is Us, of course.

 
Posted : December 6, 2022 4:52 pm
RADAR
(@dougie)
Posts: 7882
Member
 

GIF
 
Posted : December 6, 2022 5:17 pm
FL/GA PLS
(@flga-pls)
Posts: 7403
Member
 

@norman-oklahoma?ÿ

He must work with the same engineer I did on a project. When the land development portion of a housing development was completed his drainage and sanitary as-builts matched proposed elevations exactly. Imagine that. ?????ÿ

 
Posted : December 7, 2022 8:06 am
MightyMoe
(@mightymoe)
Posts: 10135
Member
 

There was a new rule passed with a local municipality; when a street reconstruction was completed a set of as-built plans were to be submitted reflecting all the changes and adjustments to utilities, grades, ect.?ÿ

Of course original plans are always submitted with no changes.?ÿ

Not my circus, not my monkeys, the engineers sign off for them.?ÿ

 
Posted : December 7, 2022 8:13 am
BStrand
(@bstrand)
Posts: 2450
Member
 

...when they had clearly changed curb and sidewalk placement from the locations we had staked.

Even if nothing had changed it would be a silly request, imo.

 