AI Assistant
Notifications
Clear all

Rough Time Estimate Question

10 Posts
10 Users
0 Reactions
426 Views
Jon Payne
(@jon-payne)
Posts: 1633
Member
Topic starter
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

If it works, here is a Google Map link:
https://mapsengine.google.com/map/edit?mid=zW4_1FTEJuJE.ke5m9J8s5aw0

I'm looking for some time estimates to see how unrealistic my initial suggestion was.

Requirements: Contours and Planimetry on about 20 acres. Looking for 2' contours.

Site is about 600' x 1300'. From the map, there are 5 buildings, concrete walking paths, pond, trees (+/-150), and an open field. Terrain is not bad. About 12 feet of fall from the north side to the pond drainage. Then about 10 feet of rise to the south side. City control can be found at the southwest and northwest corners of entire farm (essentially on site). Utilities not required. Boundary very recently done and easily recovered with no issues.

I rounded up to about 30 hours of time max.

Is that too high of expectations? Too low?


 
Posted : February 16, 2014 12:52 pm
exbert
(@exbert)
Posts: 215
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

You didn;t mention the maze, so I'll assume you're not locating that. I think three days is reasonable. If the boundary is cake then maybe only two days.


 
Posted : February 16, 2014 4:41 pm
leegreen
(@leegreen)
Posts: 2186
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

For me, solo with RTK and Robot it would take 5-8 hours in the field and about 1-3 hours in office.

The sight is very open, and you boundary is recent.

Not sure why it would take you 3 days, sounds high.


 
Posted : February 17, 2014 9:19 am
spledeus
(@spledeus)
Posts: 2757
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Get a case of redbull.


 
Posted : February 17, 2014 9:20 am
vern
 vern
(@vern)
Posts: 1514
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

I usually bid unimproved topo at about 8-10 acres/day and improved at 5 acres/day. I would say your estimate is reasonable. But then again three guys in a F250 with GPS could probably do it for $300.:'(


 
Posted : February 17, 2014 9:28 am

peter-ehlert
(@peter-ehlert)
Posts: 2958
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

I like it!


 
Posted : February 17, 2014 9:31 am
VH
 VH
(@vh)
Posts: 246
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

You can topo 20 acres in 5-8 hours? You want a job?

o.O :-O

-V


 
Posted : February 17, 2014 1:31 pm
WA-ID Surveyor
(@wa-id-surveyor)
Posts: 982
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

30 hrs was exactly what I was thinking after a quick look at the aerial. Do they need individual trees? If so that can be a pain sometimes depending on type, line of sight and such.


 
Posted : February 17, 2014 2:14 pm
ariddle
(@ariddle)
Posts: 65
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Not far off with a two man crew, RTK GPS and robotic gun.


 
Posted : February 17, 2014 8:11 pm
tommy-young
(@tommy-young)
Posts: 2405
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Figure what 100 hours of field work will cost and give them that price.

When they squawk, tell them if they don't like it they can call us.


 
Posted : February 18, 2014 5:52 am