AI Assistant
Notifications
Clear all

Measuring Column Heights

18 Posts
16 Users
0 Reactions
899 Views
Wayne Rooney
(@wayne-rooney)
Posts: 5
Member
Topic starter
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Hi all,

Can you throw out ideas for measuring as-built column heights using a total station. Laser scanning is one of the option i guess, but can we use reflective targets to measure the heights?

Thank you!


 
Posted : February 24, 2017 12:15 am
beuckie
(@beuckie)
Posts: 349
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

targetless. point at bottom, point at top, calculate the difference...


 
Posted : February 24, 2017 1:55 am
totalsurv
(@totalsurv)
Posts: 810
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Hi Wayne well done on beating Bobby Charlton's record but your time is nearly up at Manchester United.

Why not use reflectorless?


 
Posted : February 24, 2017 3:11 am
Artie Kay
(@artie-kay)
Posts: 261
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Are they hot rolled steel, concrete or masonry? What are the accuracy requirements?

For steel I usually do a quick independent check using a Leica Disto from top of base plt to underside of top plt, useful when reflectorless shots are steep. Beware sighting the point at the top against a bright sky. Multiple shots to the top can help to confirm the measurement point, especially if you can view them in cross section in CAD. Reflectorless is always a bit uncertain but maybe that's just my ageing TS, newer ones have a narrower beam.


 
Posted : February 24, 2017 3:23 am
roadhand
(@roadhand)
Posts: 1501
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Artie Kay, post: 415687, member: 3428 wrote: Are they hot rolled steel, concrete or masonry? What are the accuracy requirements?

For steel I usually do a quick independent check using a Leica Disto from top of base plt to underside of top plt, useful when reflectorless shots are steep. Beware sighting the point at the top against a bright sky. Multiple shots to the top can help to confirm the measurement point, especially if you can view them in cross section in CAD. Reflectorless is always a bit uncertain but maybe that's just my ageing TS, newer ones have a narrower beam.

We have the Disto that has the cross hair view finder that we use to measure powerline clearances. The viewfinder really helps out in the sun.


 
Posted : February 24, 2017 8:35 am

paul-in-pa
(@paul-in-pa)
Posts: 6034
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Using an SMI data collector, shoot reflector less "Separate Distance and Angle" to the face of the column, record, then turn vertically to the base, record , then turn vertically to the top and record. After the first shot by moving the instrument vertically the rod height is zeroed and the angle recorded calculating the position and elevation for each subsequent shot. I have used it for stack heights and under eave elevations for roof heights.

Paul in PA


 
Posted : February 24, 2017 8:49 am
Jp7191
(@jp7191)
Posts: 808
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

If they are steel, measure them when they are still on the truck. It is much easer that way ;). Jp
p.s. you might be surprised at the difference between plan and measured too!


 
Posted : February 24, 2017 10:17 am
larry-scott
(@larry-scott)
Posts: 1059
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

I guess vertical angles from two control points is too simple.


 
Posted : February 24, 2017 10:17 am
old2969
(@old2969)
Posts: 50
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Triangulation...double check with level rod or trig leveling random ones if possible.


 
Posted : February 24, 2017 10:42 am
larry-scott
(@larry-scott)
Posts: 1059
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

I guess the question is how many columns. A dozen or a hundred?


 
Posted : February 24, 2017 12:02 pm

dave-lindell
(@dave-lindell)
Posts: 1684
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Use a $99 Craftsman hand held laser measuring device.
Set it on the floor pointed up and click measure, voila!
(Only works if under 100 feet.)


 
Posted : February 24, 2017 12:25 pm
voidintheabyss
(@voidintheabyss)
Posts: 61
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

I think...


 
Posted : February 24, 2017 2:33 pm
peter-ehlert
(@peter-ehlert)
Posts: 2958
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

like Larry said: multiple setups, multiple vertical angles... if "accuracy" is questioned you could run a 3D star*net analysis for those that demand some high tech solution for a simple problem.


 
Posted : February 24, 2017 3:36 pm
spledeus
(@spledeus)
Posts: 2757
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Get a spotlight and measure the shadows...


 
Posted : February 24, 2017 6:53 pm
larry-scott
(@larry-scott)
Posts: 1059
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Vertical angle from two control pts.
So you setup on a point shoot 'em all. Do that from a second point. Shoot 'em again. Then, assuming Hi and all, you have the elev of tops. Shoot the elevation at the bases.

But how tall are these, how many are there, are the tops obstructed so that you can only see a couple at a time. If they're 100 ft tall it's one thing, 20 ft tall shouldn't be that hard. A leveling rod with a hook on the top could work and read it with a level. Is it 0.01 or 0.1 accuracy?


 
Posted : February 24, 2017 11:03 pm

a-harris
(@a-harris)
Posts: 8759
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

When building pole barns, we would layout the pole locations, drill a hole there with an 3pt hitch behind a tractor to the limit, set in a power pole, set a 16d finishing nail near the bottom of each pole at the same elevation and tape measure to mark the cutoff at the top of each pole.

In that way, the floor of the barn retained a slope for drainage and the roof would fit the design and look right.


 
Posted : February 24, 2017 11:25 pm
Mike Falk
(@mike-falk)
Posts: 300
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

What is your client's intended use for the information?


 
Posted : March 6, 2017 3:44 pm
rlshound
(@rlshound)
Posts: 491
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

If they are steel are they asking for plumb certification too?


 
Posted : March 6, 2017 4:01 pm