I was curious how other surveyors accomplish this task. When doing layout for an elevated structure....after the pile is laid out and the footing formed up its time to layout the column on the footing in order to set the column steel cage in the right spot. After the footing is poured precise layout is then required on the freshly cured footing for the column centerlines. This layout determines where the 6 foot diameter steel form is be oriented. I have surveyed these forms in a few different ways in the past, and I'm trying to make one method the standard.
First method: Layout the centerlines of the column on the footing, they place the form, and then I use the total station to physically shoot the top of the column in a high reach to plumb the column. While I'm up there I also shoot the top of the form to provide a cut to the finished top of column grade. Problem with this is that you can't shoot the center of the form because there is nothing there to physically shoot....so you have to shoot the side of the form on the seam and basically figure out what the offset should be from the center of the pier. For example: with a six foot column, I would stake out a line, holding one column on the left side to the other column on the right side, and then I would stake out a 0+00 station and offset 3' left or right from the line, depending on which side of the form I was on. This method is time consuming, and requires a lot of work. The advantage of this is that if the bottom of the column isn't exactly on the mark due to maybe a bad cage layout, or just some unforeseen conditions, you can make the column slightly out of plumb to make sure the top is where it should be....in most cases the pier which sits on top of the column is oversized to allow about 3" of play either side.
?ÿ
Second method: Layout centers on the footing same as above, but when the form is set, I plumb the form "old school" style with a trasit level. Setting up square to the seam line, plumbing it in one axis, and then set up 90 to that and plumb the other seam on the form. At the same time I bench in to an elevation and then just drop a tape down to read the elevation of the top form. Then I can provide a cut to the top of column without having to take a high reach or ladder to the top. I also don't have to set up an instrument and take a back sight, which saves a lot of time. The draw back for me which I am struggling with, is if the bottom of the column is lets say off an inch, then the top of the column will still be off an inch. The column may be plumb, but not in the "correct" location.
?ÿ
I would love to see what other surveyor think about this.
?ÿ
Thank you!
A lot of times the contractor will do this kind of layout himself.?ÿ How they do it I don't know.?ÿ If I was doing it myself, I would use the first method you described, which is a method I have used to mark the tops of forms before.
Try building a circle poly line then stake to line check the east or west quadrant edge of form then the north or south quadrant and adjust based on the offset.
I already have enough grey hair. I would never take on a bridge layout in that detail - those days and heartburn are over.?ÿ
?ÿ
?ÿ
N10,000, E7,000, Z100.00
PLS - IL, MO, AR, KS, MN, KY
Try building a circle poly line then stake to line check the east or west quadrant edge of form then the north or south quadrant and adjust based on the offset.
That's what we do, but we check them at the turn buckles.
I always offer the choice to the superintendent. As far as I can remember they always chose the column to be plumb even if slightly out of position. This is how we are doing it at the moment anyway
I ?ÿtoo use reference line (measure line in Leica Captivate) to measure to points on the ribs of the column form.?ÿ
For a perfectly round object like a pile cage or casing I use grazing sight angle obs to both sides, split the difference, turn the angle and measure a reflector less ?ÿshot on the cl. Calc and reference line the resulting coordinate?ÿ
There are a few shortcuts to do this depending ?ÿon the instrument and software. Or i calc it on a spreadsheet on my phone?ÿ
I don??t think it has to be a cardinal direction just approximately 90 degrees between observations.
I have not done it before.
From the old school perspective I would think that the place to start would be for the builders to tape the O.D. of the form at the top striking a line through the greatest distance, measure the hypotenuse of the associated 45-45-90 triangle and strike another line across the?ÿ can there, use those positions to set their supports and drive a nail at a common feature of the form, tie a string on the nail tape the distance from the top and adjust until the top and bottom are equal.?ÿ
I have seen guys use that approach to plumb wall formwork at about 30' and get it on the money. So it follows that if they started that way it would make the survey work much more streamlined.?ÿ
If the work can be accomplished with a level alone I would try to pass that portion of the work off on the guys. If they can not level around a can and pocket tape to the top it is time they learned, but that is just my opinion.
For the total station work I would probably use a reference line program, although if all you were interested in was the delta to center an easy way would be to just point stake it with the orientation being either "AZ to point" or set up a arbitrary line with zero at the center and a bearing toward the turnbuckle and adjust the top of can until the OD of the form is at station equal to the associated radius. Another tool to keep in hand is to shoot three points on the OD, calc the center and inverse to calculated position.
Most of the marine and bridge guys I have spoken to are wary of Surveyors due to having been burnt in the past, whatever technique I used I would try to be at unity with them by having a check built into the system based on plump line and string or something similar. The stories some of these guys have about poor survey layout are a true disgrace to the technical acumen of many of our peers.
?ÿ
?ÿ
Thanks for the advice. I also was curious what methods other surveyors use in the field to montitor the can during and after the pour, to ensure that the pole braces dont shift, and the column form remains plumb. I know from past experience that when things are slow, I have the luxury to check it during the pour, but for the most part I'm too busy to babysit and rely on the carpenters, and laborers to keep an eye on it.
If there is a need to monitor during pour the responsibility to do so should be delegated from the top and not dependent on work flow.
In my limited experience pour watch is generally done by visual inspection only and is usually by one of the guys who built the thing.
When I have done it, I used local control for convenience and used point to point inverse to monitor the relationship of the forms on themselves with direction and tolerances as defined by the engineer who designed the system.