https://www.youtube-nocookie.com/embed/cFb0nLCKypg?rel= 0">Innovative pile driving
This link gets me an error message.
Best,
Henry
How do you count the blows per foot?
Andy
Here' the engineering news formula....
.
.
take a crack at the numbers....
don't forget to figure the coefficient of tambourine.... 😛
Well there is 8 guys, each with 2 feet. They are dancing at about 140 beats per minute....
> Well there is 8 guys, each with 2 feet. They are dancing at about 140 beats per minute....
eight?!?!
OK, 6. Morning coffee is now kicked in, and I am going back to re-read that legal I just wrote. 😉
I want to be the tambourine operator. Since I'm a full-figured guy, they will probably put me up on the beam. Most efficient use of resources.
Dale Yawn,
Savannah, Ga.
Pile driving - Thanks for the fix
I should have checked the link after posting.
Wonder if they'd travel to Texas, one of our sites has been too muddy to get a crane in for a while now..
Kelley350x, post: 324468, member: 10119 wrote: Wonder if they'd travel to Texas, one of our sites has been too muddy to get a crane in for a while now..
They would take that offer so fast you could not spell Visa fast enough...