Oh for crying out load. How long does it take to save the drawing in an older version CAD? It takes me about 15 seconds. I work with a couple of en...
35 years for me this year, and I still believe that a bad day in the field is better than a good day in the office. Today, the boy and I set the last ...
"It's close enough, we ain't building pianos here ya know." As an old Party Chief used to say.
This will be client driven for sure, ask your client, or the lending institution. I don't see a problem except referencing both title commitments and ...
I would think that zoning relief of some kind would be required for any structural encroachment. Even a zoning setback of zero is violated. What do th...
I do a lot of fence line surveying, but all of mine is before the fence is in place!
Last 'big' one I did was about 12 years ago, 100 acres of industrial site, probably 15% heavy industry (chemical plant) and I charged $45K for it........
Kent, I was wondering if you got paid by the page or the corners? Or Both? 😀
I've always been partial to the K&E Paragon 20" transit, myself. What a great instrument, rugged, and NO batteries!
I use the GS14, too, but only for rtk work. Another surveying company local to me uses the gs14, too, but only for static/opus work. Their method is...
Jim Frame, post: 338601, member: 10 wrote: How come you let it expire? It wasn't worth the continuing ed requirements to me. I did it mostly out of...
I would suggest that the ALTA survey is a plan representing the current conditions, on the ground, and the rights and easements that exist, of record....
I like the ts06, but I use an allegro DC with Carlson on it in stead of the leica controller.
Wall Walker, post: 337896, member: 7427 wrote: Thanks Don. Do you do this for all jobs, or just jobs where you think there might be a lot of question...
We have a standard postcard that we send out to the neighbors, and other people in the neighborhood. It serves as notice for trespassing and also a m...
Great Job, Scott. The dove looks awesome....