Nope. No license req for Topo works.QLD, Australia.
My Brother (Carpenter) has what you describe. They're not too common but you see them around a bit. They're called a "JackOff" tray here. Lift off Ut...
1. Not safe to make such an assumption = don't make it. 2. All of our work is provided in Ground, unless specified otherwise by the client/project nee...
I too submit a Triangulation Surface model.They get it in whatever format they want. 3d AutoCAD and/or 12d ascii are the most common.
rfc, post: 334497, member: 8882 wrote: Here's a deep one for the intelligencia: 1. When drawing surveys, is it always proper to call them in a clockwi...
I guess it depends on your state/regs. In QLD Australia the 'Road Lot' has just as much rights as the free hold.If there's 3 properties with 20m front...
I guess it depends on your state/regs. In QLD Australia the 'Road Lot' has just as much rights as the free hold.If there's 3 properties with 20m front...
Cleaned off and archived to the server at the end of every quarter.Naming convention is:Data Backup Individual job files are created, and placed into ...
Robert Hill, post: 331322, member: 378 wrote: What does the dash line signify? If it was Australia the dash line would be the traverse line, require...
Work related holiday pics... though I couldn't get work to subsidise the trip...The story behind Poeppels Corner is a good read too. The heat of the A...
Cant speak for the US one, maybe if you take into account all US territories like Guam etc? Either way here I am standing at the Geographical centre o...
Do they overlap or are they end-end photos? If they have overlap then serif can do it all automatically. I'm not sure if it will handle large images ...
Construction Surveyors here use 'Extent of Works' or 'Designed Fence Line' to effectively mark the same thing without crossing that line.... Putting ...
In Australia you're free* (as long as it's flown by a CASA pilot and meets all normal flight regulations) to use UAV's for Surveys. They're currently...
I rolled over and knocked off my alarm, then promptly fell back asleep this very morning. It happens about once about every 6 months or so. When it ...
How about different countries as well? QLD, Aus;S16 Survey and Mapping Infrastructure Act 2003>A cadastral surveyor must, within 40 business days ...
We could, I suppose, just fly anywhere we wanted. All our work is off the back of public complaints. Survey is only called in after mediation and of...
I haven't seen/heard it used on a live project, but I've seen the unit and some demo data from it.For the landfill site the managers wanted updated ph...
We've just started to use them for Quarterly Volumetric Surveys at a landfill site. Photography stuff, but it's a cleared site, no vegetation. Going t...