So how come the 2nd from left on the top level is missing. All other levels have 7 red rectangles.
That's exactly why they need asbuilts. The contractor apparently had a tough time reading the plans. They missed all the embeds on the first floor. Some are off by 10" in elevation.
That's exactly why they need asbuilts. The contractor apparently had a tough time reading the plans. They missed all the embeds on the first floor. Some are off by 10" in elevation.
Oof. I would guess that's gonna hurt a bit. I have nightmares about steel stakeouts gone wrong.
On the flip side, I am often surprised at the discrepancies found in structural plansets.
Just last week I spent half a day re-calculating a bridge span and checking all our cut sheets because the contractor was insisting that our grades were wrong. Turned out a single elevation tag in the planset was not snapped to the deck profile in the actual CAD drawings.