ëÑello to everyone, i am using carlson survce 3.03 with total station.
I started a job but i make a fault is there any way to fix it?
I begin from occupy point 1 (s1) and backsight to point 2 (set to zero the instrument) then i take other points and in the last i take an another point s2=53.
When i put the instrument to s2 the right was to insert in data collector occupy point 53 and backsight point 1 and set to zero the instrument. BUT I made something wrong i insert occupy point 2 and backsight point s2=53 set to zero the instrument.
Can we do something in rw5 file or i must repeat the job?
I have Carlson Survey with Survnet 2013 in office.
You can edit the raw data file on the controller and re-process to generate correct coordinates. I suggest doing so in a copy of the job.
Editing the RW5 file is an essential skill.
ë?hanks i correct the crd file, and i see in the graphics tab (survnet) the correct points. Did you know i will insert them to dwg, itry to save as a crd file or as a new rw5 but i can not insert them.Any ideas to do it easier?
spledeus, post: 326951, member: 3579 wrote: Editing the RW5 file is an essential skill.
Understatement.
I found it thanks for ALL the answers!