AI Assistant
Notifications
Clear all

Today's Pincushion...

82 Posts
31 Users
0 Reactions
2,276 Views
csk21
(@csk21)
Posts: 57
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@aliquot

Posted by: @aliquot

Calling a monument off by 0.04' is ridiculous and should lead to remeidial education, but that is an entirely different thing than reporting your actual measument to the corner. No chaos is caused in the many states where this is standard practice.

 

I don't think many surveyors would disagree with you.  The issue is when the landowner sees 199.96' of road frontage instead of 200' they think they are getting cheated. (My deed says 200'!!!) 

Also, I've seen MANY town planning boards that we're less than qualified for their positions and quite strict in their standards.  What happens when the minimum frontage is 200' and we show a non-conforming lot of 199.96'?

I understand that we as surveyors can always do more to educate the general public/public officials, but how can we justify spending time on many jobs we do explaining .01-.05' differences in measurements?

I ran across a survey about 3 weeks ago that showed the distance between 2 found 5/8 IR's as 219.58 (R) - 219.57 (M). 

If it was me I would have stuck with the recorded distance and moved on with my day.

(Most of these are rhetorical questions and me just thinking out loud).


 
Posted : August 8, 2019 11:04 am
Jp7191
(@jp7191)
Posts: 808
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@holy-cow

In Oregon per Or. law, on new subdivision plats, the platting surveyor is field checked by the county surveyor/ city surveyor,  that monuments reported on the plat are +-0.10 or 1/10000 of the reported position.  

This has removed the ability of the platting surveyor to tell what I call “white lies”.  So we get ( in my geographic region) what I call “virtual pin cushions” found 5/8” rod with plastic cap xxxx flush per survey xxxx n28e 0.18’ from computed position.  In my last life I would just say found and accepted with the record equal to the measured data on map.  On my ‘stake out/ control sketch  ‘ I would have two point numbers, one for record and one for computed.  I would use the value the field conditions dictated. For example,   If I was staking a wall along the line I would typically use the value that was most conservative to me and my client, if I was using the found point for general site control I would use the measured value.... either way I’m with Bionic man with insignificant  numbers....only two surveyors find 0.18’ significant on a lot in a typical subdivision, basically because they judge their pecker size by their ability to measure.  I personally am over that personal inadequacy and typically have my eyes open for more significant numbers.

i could go on about this topic because we have the habitual abusers that basically accept 1 plss corner and another for direction and call all other found monuments out of position.  Once again because we can measure so well since the invent of electronics and computers these values form nothing more than what I consider the error ellipse of the new breed of land surveyors. For the most part measurement error reporting is much better than prior to the electronics. 

My 2 cents, Jp


 
Posted : August 8, 2019 12:34 pm
dmyhill
(@dmyhill)
Posts: 3080
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@csk21

I would say that most of our issues have to do with the industry wide refusal to conform to the rules of significant digits. I know why we do not, it simply isn't done that way. We publish all sorts of numbers, and we hope that the reader is able to understand what digits are significant and which are not.

Take the last example: "219.58 (R) - 219.57 (M)". 

If you are publishing to the hundredths, then you put down what you measured. It is what it is. We all know that 219.58=219.59 in the real world. But, it doesn't quit feel right to say "219.58 (R&M)" when that isn't the results you got in the field. Perhaps if we simply said "219.6 R&M" things would work out better. (And with the GPS used on many surveys, we would be fully justified in only publishing to the tenth of a foot.)


 
Posted : August 8, 2019 1:37 pm
dmyhill
(@dmyhill)
Posts: 3080
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@flyin-solo

If the actual pipe is in the deed how in the world would anyone set a pincushion? That is simply nuts. 

The ones I have seen are the result of multiple surveyors attempting to find the same corner as described in different (or the same deed), and basically zero of them describe a bound (around here at least).


 
Posted : August 8, 2019 1:47 pm
dmyhill
(@dmyhill)
Posts: 3080
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@mightymoe

Had another company come in and set a second punch in a 3" Centerline surface monument set by us (that already had a perfectly fine punch).

I was less than impressed.


 
Posted : August 8, 2019 1:50 pm

MightyMoe
(@mightymoe)
Posts: 10534
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@flyin-solo

Looks like it's clean up time.


 
Posted : August 8, 2019 1:51 pm
aliquot
(@aliquot)
Posts: 2323
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@jp7191

Those virtual pin cushions are an awful practice. I never know what they are trying to say. Is the monument their corner, is it their computed position, or are they punting??ÿ

I think the "white lies" are misleading too though, reporting the record every time gives the strong impression that the measurement is controlling. If we fudge our measurements to match the record, it is easy to see how someone could come tho the conclusion that if the measurement doesn't match, its not the corner.

I have always reported the actual measurements, and never have had to spend a significant amount of time explaining small differences. Monuments on the ground controlling is something that is easy for most to understand. Easier to understand than moving the corner they grew up believing in because I?ÿ measured 2' different than a surveyor did in 1898.?ÿ

The majority of local governments I have encountered understand, at least in theory, the variations in measurements, and apply their regulations to the nominal area (or length), the area of the parcel when it was created.?ÿ I did have one unpleasant encounter with one that didn't, but standing my ground?ÿ did wonders. If you are letting a planner, or title company dictate how you resolve your boundaries you are ceding your professional judgment to a non professional.

Off topic, but they actually check your measurements in the field??????ÿ


 
Posted : August 8, 2019 1:52 pm
MightyMoe
(@mightymoe)
Posts: 10534
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@dmyhill

That's terrible!!!

Long before GPS was a thing I was at one of those CE conferences and a couple of surveyors from another city were sharing my table and in a heated argument concerning a corner. Boiled down to the basic conflict, I gathered it was over .03'...……...

I guess we just don't care enough around here. Usually we accept monuments, there are some cases when it isn't so, but not because of math.

Next week we will be pulling a 1" pipe. Accepting the stone mound 30' away.

I also have a 1-1/2" pipe about 50' from a set stone and rebar. That one also needs to disappear, although maybe it can be used as an accessory.


 
Posted : August 8, 2019 2:03 pm
Jp7191
(@jp7191)
Posts: 808
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@aliquot

Thanks for your reply.

Yes.  We actually field check the monuments in the field on new subdivisions.

My white lies thoughts go back to the days when we would steel tape long lines between monuments. If we did not measure “close to record” ( or if we thought the record surveyor was a cull) we would have to chain it again.  It did not take me long to understand measurement error. Re-tapping with two dumb asses that couldn’t pick their nose the same way twice.  I exagerate and there is a lot of art in surveying and some professionals have a very good way of presenting that art and others don’t. 

You state that you always report your actual measurement.  But what do you do when you are retracing a 1990’s subdivision that created a curvilinear road.  Centerline and 2 right of ways complete with monuments. Now let’s say part of this road has a reverse curve with 0 tangent between curves and you find all 9 monuments that define the horizontal geometry breaks.  You know as well as me that those 9 points are not going to fit. Maybe +- 0.05, 0.10 or maybe 0.25’.  Are you going to come up with new geometry? Are you going to call a couple out of position to make the others fit record? It all depends right!  Personally it is my opinion that curves were created in subdivisions for aesthetics more than for enginering purposes and “we once would loose our “error” in the curves” before everyone had the ability to measure so damn well :).  All I am saying is that no one has written the new manual on how to report incidental error on our surveys.  Until some wise one rises from the grave and adds a chapter to his 40 year old bible (Clark, Brown....) we are stuck debating the topic on a public forum.  Not a good professional plan and reducing the acceptable error ellipse with every new change in technology is defently not a good path to go down.  Leave the art and practice of surveying to the surveyor but for Gods sake  let’s get together on what the minimum standard of practice is on the simple issues.  

Thanks, Jp


 
Posted : August 8, 2019 5:56 pm
holy-cow
(@holy-cow)
Posts: 25672
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

A piece of data is collected. ?ÿPerhaps by an electronic data collector or perhaps by pencil in a field book. ?ÿThat single piece of data may or may not be correct. ?ÿCome back to that same monument on a different day at a different time of day with different environmental conditions and with different company-owned equipment. ?ÿRepeat several times. ?ÿPerhaps use a different employee a few times. ?ÿThe resultant data will vary considerably for just that single point. ?ÿExpand this to a dozen or more monuments of different styles that are related (A boundary of a tract, for example). Run all the theoretical number crunching desired. ?ÿThen cease to report gnat's patootie bearings and distances.

A simple example using a total station setup with the exact same equipment but three different rodmen. ?ÿThe same data will not be produced by all three. ?ÿOne will almost always have a shorter distance from gun to rod than the other two. ?ÿOne will routinely have longer distances. ?ÿThe third may agree on distance with one of the others but will be leaning the rod a bit to the left (or right) consistently relative to either of the other two, thus producing different bearings. ?ÿSwitching to GPS doesn't help because the same human frailties are involved.

Retracement work accentuates the foolishness of pretending one's micro-measurement is superior. ?ÿClaiming a hundredth or 3 0r 4 of measurement error and a small number of arc-seconds merely proves that your error ellipse and your choice of spot on the monument to shoot falls within the error ellipse of the tract creator and his choice of spot on the monument. ?ÿThis should be the norm when following modern work. ?ÿComparing micrometer tools to monuments originally measured in axe handle lengths, of course, will have vastly different results. ?ÿWhen the results hit the monument, why reinvent the wheel?

?ÿ

?ÿ

?ÿ

?ÿ


 
Posted : August 8, 2019 9:06 pm

holy-cow
(@holy-cow)
Posts: 25672
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Repeatability.


 
Posted : August 9, 2019 11:16 am
holy-cow
(@holy-cow)
Posts: 25672
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

What I have learned here is that there is the Texas Method and there is the Everywhere Else Method. ?ÿThe Texas Method encourages the rewriting of the original description by every retracement surveyor forever and ever. ?ÿThe written location of the boundary is never settled because of the need to report different distances/bearings to prove the latest surveyor didn't simply repeat the prior surveyor's number. ?ÿTo use the same numbers makes the latest surveyor appear to be negligent.

?ÿ

Let's leave the Texas Method in Texas as the entire property ownership system in Texas is comfortable with that chaos, whereas Everywhere Else is not.

?ÿ

When my neighbor's deed says his tract is such and such by so and so and begins here and ends there, that is where it is. ?ÿMy description needs to match his description on our adjoining sides. ?ÿThen my neighbor on my other side needs a description compatible with mine. ?ÿThey need to fit neatly. ?ÿThe rest of those involved in real property are counting on us to make it that way.


 
Posted : August 9, 2019 11:35 am
scott-ellis
(@scott-ellis)
Posts: 1181
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@holy-cow

You have no clue how to Survey in Texas, why are you so obsessed with Texas Surveying?


 
Posted : August 9, 2019 12:13 pm
flyin-solo
(@flyin-solo)
Posts: 1675
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@holy-cow

imo, it's only chaotic to those who obsessed with numbers.?ÿ and, admittedly, the collective effort to perpetuate good language in the drafting of metes and bounds is a little lacking, but the bottom line, legally- as far as i understand it and practice it- is as such:

in the preamble to any legally valid description, there must be reference made to SOME vesting document.?ÿ doesn't have to be the most current (though it almost always is), but it does need to refer to a document that would allow the layperson to reference the description against a known quantity.?ÿ jumping off from there is where you start seeing... chaos.?ÿ?ÿ

because as far as i'm concerned, if i go out and retrace a survey and find, substantially, the called for monuments/bounds in undisturbed condition and, generally, nothing to indicate any errors in the previous referenced deed in the preamble to my metes and bounds, then the language is- explicity- "BEING?ÿTHAT SAME TRACT AS CONVEYED TO JOE SCHMO BY VOL, PG, DATED..." and commence to report my bearings and distances?ÿas measured on the date of my survey.?ÿ?ÿtitle people here get that.?ÿ MOST attorneys these days get that.?ÿ eventually maybe more of the GIS gnats will get it, and i have no problem explaining to clients why the numbers aren't exactly the same (it's an included component of my fee, let's say).

i also include a bearing and coordinate basis statement at the end of every description (as is required by statute) because, in fact, many of the deeds being retraced are based on solar shots or ancient compass readings or some other unknown (and often arbitrary) bearing, which i'm not about to hold just because it's record.?ÿ otherwise all this cash i've laid out for gear over the last howevermany years has largely been a waste of money.


 
Posted : August 9, 2019 12:36 pm
flyin-solo
(@flyin-solo)
Posts: 1675
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 
Posted by: @dmyhill

?ÿ

If the actual pipe is in the deed how in the world would anyone set a pincushion? That is simply nuts.?ÿ

?ÿ

they's better measurers, i reckon.


 
Posted : August 9, 2019 12:41 pm

a-harris
(@a-harris)
Posts: 8759
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@holy-cow

The important thing to notice in every description, original, re-written or ancient is what is called for and what is found for monuments.

"It is better to have measured wrong to the correct moment than it is to have measured exactly to the wrong location." This is what I say as paraphrased from what Alan Greenspan said and mentioned in the sayings of that Supreme Court Justice.

https://www.webassign.net/question_assets/unccolphysmechl1/measurements/manual.html

A critical legal requirement in Texas is that the new property description and drawing properly note the existing neighboring property owners at the time of the survey and the legal documents that are on record of the property being surveyed that reflect the current owner claims.

This alone requires re-writing the description.

I believe that Everywhere there is that element of "I can measure better than you" attitude.

Then there has been that "My equipment is better than your" attitude.

Mostly it recent times it is falling prey to "My datum is better than yours" attitude.

What ugly attitude will rear its head next to muddle the puddle.

 


 
Posted : August 9, 2019 12:43 pm
mattsib79
(@mattsib79)
Posts: 376
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Todayƒ??s pin cushion. Notice the caps have the same number.


 
Posted : August 16, 2019 7:23 am
fairleywell
(@fairleywell)
Posts: 184
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@flyin-solo

My math is better than yours! 


 
Posted : August 16, 2019 7:48 am
jamesf1
(@jamesf1)
Posts: 403
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 
Posted by: @scott-ellis

The only problem with that is sometimes, on rare occasions all the iron rods are correct.

In fact, if they are all original they are indeed all correct!


 
Posted : August 16, 2019 12:10 pm
mattsib79
(@mattsib79)
Posts: 376
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

@jamesf1

So the reason I am surveying these properties is they plan on constructing a concrete drainage channel on the rear of the lots and I had to locate all monuments so I can replace them. 

So once the ditch has been constructed do I replace both pins?

 

I plan on drilling holes and setting mag nails with washers in place of all of the pins found at their original locations.

 

 


 
Posted : August 16, 2019 3:01 pm

Page 4 / 5