If anyone has any experience setting these, send me an email. I need to pick your brain.
Oodles of experience back to the middle 1980s.
cjmce@LSU.edu
We have set a lot over the last 10 years.
jody.budde@foth.com
I assume you have seen the video at http://www.berntsen.com/Surveying/Survey-Monuments/Top-Security-Rod--Monuments
Remember the "to refusal" pertains to the rod and not installer :'( :'(
> Remember the "to refusal" pertains to the rod and not installer
I'm skeptical about the refusal standard. After you have 20 feet or so of rod in the ground -- unless you're pushing it through muck -- I wonder if enough friction will develop around the rod in most soils to accomplish the same stability without incurring the cost (roughly $25 per foot for 3/4" aluminum, once you figure in labor) of getting down to 1 inch per minute.