Thanks for all your help. The CSRS site seemed to work fine and solutions seem to agree with another sites (AUSPOS) horizontals locations fairly well...
ok...that seemed to work. So...I started out with my BASE.TPS (one file)....and now I have 3 different BASE files after conversion(BASE.13G, BASE.13N...
downloaded the TPR2RIN from Topcon and when I try to run it....it opens for a split second and then disappears. Driving me MAD!
I had same experience with them. Took test in morning and called them before I made it back home to WV and got "passed" results before I even made it ...
Thanks to all who replied and sent emails! Much appreciated!
Thanks Chuck. Yes it helps.....we are, however, already doing that one...as well as actually putting each days stakeout on its own layer.
Thanx for all the responses. Turns out...I had an unspecified drawing corruption jn the basemap.Started new dwg...imported all point into it...wblocke...
I know Dave......it's a x12 scale.....and the factor the other direction is .0833333.......so yes...we caught that (and initially just thought that on...
"insunits" = (0) in both drawings.I'm stumped at this point.
Thanks so much for all the help. That was exactly the info I was looking for.Looks like I have ALOT of studying to do..lol!
I get that alot David. The real sad thing is....in our area (especially during Lean Times)....if they call the right place..they can probably get it ...
Thank you Jon. And to Dan....Thank you for the effort also, However, I realize I can go to the website that you provoded the link to (like I said "th...