I never erase anything.Just a diagonal line,and move on.
I would use GPS to set some control,but after that,everything would be done by total station.
I say, imprison the bastards.
Glenn, I am interested in the Wild T-2. Please email me at : jicemanmac@msn.com Thank you, John
I do mostly Road Corridor surveys now.I was taught to traverse through the Road Monuments,but with traffic these days,I traverse off the roadway. ( re...
I have done triangulation on hydrographic surveys in early 1980's. Out of town for 3-4 weeks,working everyday for 10-12 hours per day,and hopping from...
Kent, Interesting reading. Thank you for posting.
I've been a member of SNARE for 42 years !!
I tell them the old bull,young bull story.
If the pins are still available,I would be interested. Thank you Angel, John
I remember party lines for the telephones,banks were open Mon to Fri,10am to 3pm ( banker's hours ) no malls,stores closed at 5:30 pm,open on Sat till...
NCEES website and just chose California as her "governing body". Despite not living there. She did this because Washington requires one year more expe...
This is my 42nd year surveying.Double chaining,star shots,Wild T1-A,inverted image,reading stadia with inverted image and snow on stadia rod.Run true ...
My crew and myself always open the storm sewer manholes,to get direction and measure downs to the inverts.We have a Pipe-Mic if needed.Sanitary sewer ...
not worth a crap.
I would set an even foot offset,star drill concrete,set lead with tack.
1) everyday work : Wild T1-A2) traverse : Wild T23) 1st order control : Wild T3
yep,I remember.
1974 chain and Wild T1-A with inverted image.
I used a 14oz brass plumb bob.When the gammon reel came into existance,I wanted to try one,but my old party chief,Ernie,would not let me try one.I was...