Activity
 
Notifications
Clear all
hgman
@hgman
Registered
Joined: Aug 5, 2014
Topics: 3 / Replies: 57
Reply
RE: ALTA "Reliance Letter"

Mike Marks, post: 364468, member: 1108 wrote: Methinks the attorney is barking up the wrong tree: [INDENT]In nearly all instances, the Lender should ...

9 years ago
Reply
RE: Backsight distances

We once had a site super call and angrily tell us the brick points we set on his building were out more than 2 inches. After making some inquiries, i...

9 years ago
Topic
Replies: 3
Views: 2
Reply
RE: If you could tell a newbie one thing...what would it be?

Always document your work. Nothing is worse for me in the office than trying to track down a problem with a survey, asking the crew what they did, an...

9 years ago
Reply
RE: 2016 ALTA/NSPS Standards - Table A

Adam, post: 355021, member: 8900 wrote: The job I mentioned earlier was in Graham, I could of have put him to work on that one. Thanks I will keep him...

9 years ago
Reply
RE: 2016 ALTA/NSPS Standards - Table A

Shawn Billings, post: 354744, member: 6521 wrote: Wow. That seems like an excellent approach. Does the private locator have access to utility plans, o...

9 years ago
Reply
RE: 2016 ALTA/NSPS Standards - Table A

Adam, post: 354751, member: 8900 wrote: Hgman, does your locator cover the foothills area? We've had him mark statewide for us. He works out of the ...

9 years ago
Reply
RE: 2016 ALTA/NSPS Standards - Table A

Adam, post: 354735, member: 8900 wrote: In North Carolina it was legislated two years ago that 811 must be notified when performing a survey of any ki...

9 years ago
Reply
RE: Carrying the Instrument

I'm just a hair over 5'3", and I always preferred to carry the instrument in the case, because I could always stand on the case if I needed to to set ...

9 years ago
Reply
RE: Does a public easement for a road more the fee boundary?

In North Carolina, the General Statutes state that if a public roadway is abandoned per the statutes, the underlying fee is conclusively (i.e. irrefut...

9 years ago
Reply
RE: Christmas bonuses

over the past decade or so, we've transitioned from Christmas bonuses into year-end performance bonuses. Each billing cycle, the owner sets aside an ...

9 years ago
Reply
RE: We are not really surveyors any more.

Holy Cow, post: 346331, member: 50 wrote: Many true words strung together, Nate. Most of our jobs have visible corners but invisible lines. All they ...

9 years ago
Reply
RE: HUD ALTA's

my experience with HUD ALTAs is that they take forever to close after the survey is complete. I've had a survey take 6 or 7 months to close - so long...

9 years ago
Reply
RE: How do you do a Boundary Line Agreement?

Around these parts (NC) a Boundary Line Agreement can be drafted by an attorney and recorded with the local Register of Deeds. Typically there is lan...

9 years ago
Reply
RE: Locating PVC Pipe

The utility locator we use has located PVC sewer cleanout lines by snaking the line with a metal tape and inducing the signal. Not sure this would wo...

9 years ago
Page 1 / 4