For what it's worth, he was running east from a known point setting block corners. At Lattitude N 31?ø45'32.1" with an average elevation of 4000', he ...
This is the southeast section corner and I am staking off the west half of the section.?ÿ The southwest corner of the section is missing, so I will se...
This section was created by protraction and the nearest original monument that was set was about 21 miles away. A special surveyor was brought in to c...
Just west of Toledo, Ohio. Seems like it would only have 2 quarter sections and then lots for the remainder. I'm not familiar with surveying in Ohio, ...
I think the answer is to point them to Texas Administrative Code Title 22 Part 29 Chapter 663 Subchapter B Rule 663.15 Precision and Accuracy ?ÿ Surve...
That's nice. I don't use it.
I don't say "more or less". I say "containing a calculated acreage of..."
Property manager whose land we do a lot of work on in sizes from 1 acre to 640+ just sent over new plat standards that require acreage to 4 decimal pl...
Posted by: arctan(x) I want another opinion about the easement labeled as a 30' road and utility easement along Dublin Road.?ÿ That's interesting. I d...
Some of it could be licensure by comity, but I think there are less people attempting SIT each year. I believe it is a sign of a disturbing trend.
8 individuals passed the SIT test. That is a shockingly low number to me.
There's some customer care for you.?ÿ
@dave, Yeah, well, I know better now.?ÿ But, to say the deed is incomplete is not correct.
Posted by: A Harris Our government agencies that control auctions and resale of properties are at almost 100% of their recordings referring to prior d...
Check your state requirements with your Board of Land Surveying (or whichever board regulates surveyors). What state are you in?