This building is 500 metres plus long and 7 floors high, you can see from the right hand edge of photo to the end of the green at the left side is the length of the building.
I did the structure layout and then went inside for the machinery set up, production lines carry vertically and horiz. tolerances to 1.5mm. internally.
I was to go on the scaffold one day to bring up some elevation marks, but it collapsed the previous night at 11pm, when no one was on it, due to torrential rain, and lax inspections of the screwjacks. etc.
One day a semi went along from site, it had a shipping container on the flatbed, a chinese guy was on top of the container lifting the powerlines with a broom, so they could pass under.
Everytime I went to a different company, I had a different instrument, at least my own hp48 was consistent.
Cheers
David
>...a chinese guy was on top of the container lifting the powerlines with a broom, so they could pass under.
At least he had a broom.
Someone was decapitated here a couple of years ago doing that.
They were moving a house. I don't think OSHA approves of it.