AI Assistant
Notifications
Clear all

Pics from a job we're on---

1 Posts
1 Users
0 Reactions
724 Views
rankin_file
(@rankin_file)
Posts: 4079
Member
Topic starter
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

This job has finally gone to contract. The control traverse for it is a pretty dismal tale. Run conventionally (on a local system that is based on a bearing system I'm ashamed of)- mostly within feet of the fogline, in 1987, metricated, "maintained" at the rate of destroying 40% of it within 3 years of it's establishment,etc, etc. anyway- we're densifying/verifying the control, so we put in 3 of these.

4' concrete sono tube w/ aluminum cap.

we'll traverse through everything that's left, and verify the level run, do re-sets on 2 NGS benches, then adjust it all in Star*net. We'll also establish positions- at a minimum OPUS-DB on these permanant monuments.

this is the condition of one of the bridges...... you can see our new control point in the background of one of the pics.....


 
Posted : August 21, 2012 7:15 pm