Activity
 
Notifications
Clear all
yyamahayzf
@yyamahayzf
Registered
Joined: Mar 25, 2011
Topics: 9 / Replies: 8
Reply
8 years ago
Topic
Topic
Replies: 7
Views: 6
Topic
9 years ago
Replies: 35
Views: 1
Topic
Replies: 4
Views: 4
Topic
Replies: 3
Views: 1
Topic
10 years ago
Replies: 14
Views: 0
Reply
RE: Verifying Control with GPS

I would do a site calibration to make all the points fit to there hort and vert. Make sure you box out the site so all the point are include. After ...

13 years ago
Topic
14 years ago
Replies: 3
Views: 3
Reply
RE: GPS and Total Station used together

I am using a 3 second Leica total station. I am not currently seeing any large residuals.

14 years ago
Reply
RE: GPS and Total Station used together

That's an easy one...I am on long island,ny doing a topographic survey of dune road which is very close to the water at elevation 2.0-6.0. There in no...

14 years ago
Reply
RE: GPS and Total Station used together

> You are doing RTK or static GPS? How long are your occupations?I am doing RTK, my occupations are 3 minutes long with .05 horizontal, .05 vertic...

14 years ago
Reply
RE: GPS and Total Station used together

> One word for what you're doing "static"> > First, assuming you're in the middle of the project, are on the grid (scale factor)> Did you ...

14 years ago
Reply
RE: GPS and Total Station used together

> are you creating a calibration or localization? If so, they are notoriously weak in a corridor type roadway project. Could you give us a bit mo...

14 years ago
Reply
RE: GPS and Total Station used together

At the end of the job, we had previously did some GPS work and before setting the points with GPS and we hit the points and the bench for hundredths. ...

14 years ago
Topic
Replies: 61
Views: 4