The ways of the blunder are many, and varied. Now I have to make a new sign to hang in my office.
I think they're using the cost of a "mortgage survey" for the estimate. Of course no one reads that far into the article to figure that out, even if ...
I'm going to dig into these references when I have some free time. I wanted to make a quick comment based on a recent project. My client h...
Thanks for the responses everyone.?ÿ I have a copy of the ANR handbook and will be reading up on this question over the weekend.?ÿ Right now i'd rathe...
I work in Mass and have prepared similar sketched as Peter shows.?ÿ This was a big discussion in an office I worked in several years ago.?ÿ The survey...
I've worked pipeline before and I'd call these low order marks. They appear to be marking locations above the pipe that are used during the pipe insp...
Thanks for looking. I was assuming is said you needed a recent field survey. I'll keep trying to find one. There could be one floating around the o...
foggyidea, post: 409749, member: 155 wrote: There was a period here in MA ...The Board of Registration steeped in with a memo that ended that practice...
Stephen, I like the transparency and may have to adopt that. My note was flattened in the PDF. Kent, I'm pretty sure that's what the client did.
I sent a pdf of a plan out to a client with a big, red, "FOR REVIEW" stamp embedded in the pdf. A week later we got the documents back to review and ...
The real question is, why does everyone assume their naming standards are obvious? You can use what every you want in your company but could you tell...
How do you use the contours from 1940? Are they mapped that well? I wouldn't assume the ground is the same elevation or that any contour line I crea...
That did it! You guys are a great help. As a decade plus Carlson user, I had no idea where to find that. Got to note that for everyone else here now...
I have definitely surveyed roads that were declared variable width based on the stone walls. Might a deep search of the town archives turned something...
Thanks. This is a good starting point for me. I'm definitely planning to take the UNH course.
I don't know about merging 2 groups, but you can list 2, or more, groups at the same time.
You can control the precision of your point labels independently of the unit precision setting for cad. In the middle right of the draw-locate screen...