Last seen: November 12, 2024 6:31 am
It’s just a stock photo probably grabbed by the advertising company. I once saw a U.S. company ad with workers holding a metric level rod.
@taylor81 don’t know, cable my company had. Only used it to start R8-2 as a base. Only used it once in the past 2.5 years since getting R12i
@jitterboogie Think I found the solution-- there's a button in the survey editor panel that says update database from drawing. So click the edited l...
@bstrand no. Figures wont be redrawn unless you bring in the same file choosing to delete import event. I’ve done it as I’ve stated for 11 years now.
@bstrand you are probably better off editing the figure after you’ve stopped reimporting your data file. That’s what I do
Which constellations were you observing? Makes a difference for what you’re stating. And turning off your IMU probably would have made for a better te...
Been there done that, only connect with a cable.
Anyone know if there's a way to have Civil 3D redraw only survey figures that have been affected by changes to the points that define them? what ex...
@baba234 Trimble has videos on YouTube and a long archive of power hour webinars on one of their webpages
Access 2015 is old. Access have traverse adjustment but not a network adjustment. You could use RTK as a check but not much else without TBC
@on_point have 2 base stations setup to observe each point from different locations, or move your base and reobserve your points so your adjustment so...
@rover83 I do not recommend using “average” in Access if you intend to recompute, average in TBC because an averaged point in TA is seen as a computed...
@dave-karoly what epoch rate were you collecting at. Might not be a big issue almost like a cycle slip. I am going to have to try this dos thing and s...
Keep in mind the default Trimble access setting is for 1-sigma, aka 0.67 confidence and not 95% confidence. 0.1 at 67% is a but higher at 95% setting....
First, why are you needing to convert to rinex? to send to OPUS? If so use the ??processing services ?? from the Survey tab. There is will send raw...
On one of the tabs in TBC , support?, there??s a link to many recorded power hour webinars with lots if good info. Interface will look different on o...
Reset satellite tracking clears any lingering satellite data and is quicker to do.
It depends on your accuracy requirements. Trimble R10/12 for RTN/VRS use is plus/minus 0.5 PPM which creeps into larger values when you get far from y...
Bug reports and suggestions go to Trimble vendors. They prioritize fixes and enhancements. Just because you don??t see your input acted upon in the n...
The only paper field notes now are level runs; but don??t do them on every project. I don??t take paper into the field. PDF, DXF, JPG, all into the ...