Trimble Business Center — From point cloud to plan sheet. Start free trial.
AI Assistant
Notifications
Clear all
Kent McMillan
Kent McMillan
@kent-mcmillan
Free
Joined: June 30, 2010 7:03 pm
Topics: 588 / Replies: 10828
Reply
RE: Controlling the great southern lands

Richard Imrie, post: 432587, member: 11256 wrote: The text on the plaque is alternating English and I presume the Maori translation of that English. I...

9 years ago
Reply
RE: Not to Put Too Fine a Point on Things...

Jim Frame, post: 432576, member: 10 wrote: ...but I find the new-style prism pole points to be way too blunt for my purposes. I chuck them in a drill...

9 years ago
Reply
RE: Does someone make these or anyone else see any need?

Mark Mayer, post: 432418, member: 424 wrote: This is the variety I use. It sounds like what Kent described. Yes, that's exactly the item, only mine i...

9 years ago
Reply
RE: Does someone make these or anyone else see any need?

Hmm. I have a topo foot for my prism poles that is the same height as the pointed foot. I've had it for at least twenty years. It's really not a probl...

9 years ago
Reply
RE: Axle in the 1857 Rock Mound

flyin solo, post: 432358, member: 8089 wrote: I don't know in this particular case, but like on that last one I'm thinking that tranny shafts are what...

9 years ago
Topic
Replies: 2
Views: 481
Reply
RE: A Way to Plan Survey Accuracy

Conrad, post: 432306, member: 6642 wrote: So it appears to me that at station 9, the 1" instrument traverse with GNSS ties just at the ends is keeping...

9 years ago
Reply
RE: A Way to Plan Survey Accuracy

Here are what the uncertainties looks like with vectors from Pt. 1 to Pts. 6, 11, and 17 in addition to those to 2, 3, 23, and 24.These use Conrad's i...

9 years ago
Reply
RE: A Way to Plan Survey Accuracy

Mark Mayer, post: 432298, member: 424 wrote: This example would like to have a vector into maybe 10, 11, or 12 in addition to the beginning and end. ...

9 years ago
Reply
RE: A Way to Plan Survey Accuracy

Mark Mayer, post: 432293, member: 424 wrote: What I see is that going to a 1" gun doesn't do much for the precision of the final coordinates.I think t...

9 years ago
Reply
RE: A Way to Plan Survey Accuracy

So, using an instrument with the very low uncertainties that Conrad suggested should give the following uncertainties of points along the traverse if ...

9 years ago
Reply
RE: A Way to Plan Survey Accuracy

Here are the predicted uncertainties of the control points connected by the traverse if the following instrument uncertainties that Conrad asked about...

9 years ago
Reply
RE: A Way to Plan Survey Accuracy

Conrad, post: 432274, member: 6642 wrote: Hello Kent, you deserve kudos for taking the time to post that here. It can only be a good thing if a few mo...

9 years ago
Reply
RE: A Way to Plan Survey Accuracy

Okay, so GNSS vectors with an uncertainty of +/-8mm (= 0.026 ft. in N and E) to all control points on the traverse that are then connected by conventi...

9 years ago
Reply
RE: A Way to Plan Survey Accuracy

So, if just two more vectors in parts of the traverse where the uncertainties are larger makes such an improvement, what would adding GNSS vectors of ...

9 years ago
Reply
RE: A Way to Plan Survey Accuracy

So, one obvious improvement would be to add GNSS vectors of the same 8mm quality (standard error of 0.026 ft. in N and E components of coordinates der...

9 years ago
Reply
RE: A Way to Plan Survey Accuracy

One approach would be to survey Pts. 2 and 3 and Pts. 23 and 24 at the beginning and end of the traverse, respectively, to get an approximate starting...

9 years ago
Topic
Replies: 17
Views: 499
Reply
RE: Identify this Splined Shaft, Please

back-chain, post: 432221, member: 7900 wrote: Kind of looks like the main shaft out of a 70s Honda CB. Is it set in concrete? Any idea on total length...

9 years ago
Page 35 / 571