From the post it sounded to me as though they were all using different control that each crew created....this simply does not work and will create big...
The issue here is that all crews MUST use same control and it must be a requirement to do so. ?ÿ ?ÿ
@joe-b Hmmmm, from the link to the changes: "Eliminating the Elevation Certificate (EC)requirement for rating purposes, whileallowing ECs optionally f...
@chris-bouffard I have to resect all the time on large sites simply due to the large amount of equipment, spoil piles, building materials, etc. in the...
What you have to do when you move points in Carlson (I use 2020 but believe it was the same in 2009) is go to points>coordinate file utiiities>u...
@lukenz So what bluetooth version is getting nearly 2000'? ?ÿ
J. Penry, post: 378469, member: 321 wrote: 1" - 2" diameter white or gray PVC with an end cap on the top might be appropriate. Sorry, forgot to ment...
Does Survce have some way of reporting the results of the localization like a closure as with a resection?
Don't Like Postal Service? How about gov't Med. CareThat's going to be fantastic......NOT!!!For God's sake, if they have difficulty delivering postcar...
Check, Double-Check.............Check, Double-Check, triple check, and check again before you leave the job site.While your other points are also very...