Notifications
Clear all
Topic starter
We've been doing a bunch of subdivisions lately.
Our involvement with them is boundary and platting only anymore.
All the topo, layout design, engineering and construction is done by others.
One thing at the end of the project we need to do is set Lot corners.
Here is a picture of one subdivision and the stamped lot corners ready for setting.
There were 75, one day the PC was rained out for a boundary, came back to town and set 60 of them. The rebar is pounded in by the Dewalt, saves tons of time.
Posted : June 23, 2023 10:04 am