AI Assistant
Notifications
Clear all

Building Setbacks on a ROS

21 Posts
11 Users
4 Reactions
3,178 Views
eapls2708
(@eapls2708)
Posts: 1907
Member
Translate
English
Spanish
French
German
Italian
Portuguese
Russian
Chinese
Japanese
Korean
Arabic
Hindi
Dutch
Polish
Turkish
Vietnamese
Thai
Swedish
Danish
Finnish
Norwegian
Czech
Hungarian
Romanian
Greek
Hebrew
Indonesian
Malay
Ukrainian
Bulgarian
Croatian
Slovak
Slovenian
Serbian
Lithuanian
Latvian
Estonian
 

Posted by: @ron-wright

Thanks for the feedback. This is a requirement on a city application for a Lot Line adjustment. The ROS gets reviewed by the City Engineer. I'm going to request to remove the setback lines and see what happens.

 

You could put the setbacks on the drawing for review of the application and then leave them off the final, to be recorded drawing.  I've done that with subdivision and minor land division maps where the planning department or sewer district wanted to see such things specifically for some portion of administrative review, but then left those things off of the final map.  In those cases, the final map goes around to all the same departments for signature and I've never had one kicked back for not showing whatever feature they wanted to see on the preliminary review copy.

 


 
Posted : September 3, 2025 7:17 pm
Page 2 / 2