briniker, is your logic statement for the calculation of the pipe invert elevation( elevation-DIP) or the specification of the formatting (test height = 0.00001)? Do you have one structure label style -or- 1 label style for each possible pipe entry into the structure that was setup?
There is one label style but an expression for text height for each pipe.
I see. Thanks!!!!
Any ideas on how to format the height (so to turn off) non-used pipe data/inverts in a table?
Thats a good question, our workflow didn't use tables for this so I haven't tried it, but thinking about it I do not have an easy solution.
OK - thanks for your input on this issue. This process has significantly improved our data collection and drafting procedures. If I could just figure out the table issue.....
-Scott