In the TSC2 that is setup and working, open up the notepad or some other text app, then try selecting (highlighting) the password and then paste it as...
It is on a prism pole. I know that isn't the best method but it good enough for what we need right now. 4.98 on the rod equals 4.90 taped. We measured...
Not very proud of it but,Microstation V8i (Select Series 3) with GeoPAK Survey
We have had that issue with our S6 as well. It is usually between 0.03'-0.06'for the vertical check, even on shots around 200'. We just got ours bac...
I feel like I already know what I'm getting with the Trimble and the Leica is going to more of a gamble. I really think that the Viva software is goi...
Those distances don't really fit any descriptions either.
That is something similar to what I was looking for, but as you said, it does look a little more complex. I am wanting to put together something that ...
Oh yeah, I forgot to answer some questions. I did shoot the bs for a check when I zeroed and the distance checked to .03'. The coordinates for #1 &...
Thanks for the help and suggestions. I'm going back out there tomorrow to reset the 2d with GPS. The office I work out of isn't totally on board with ...
That's not awful in 7000' with 10+ setups. I'm just trying to figure out how 2 known points in the same traverse leg can be off by such a big differen...
I have not summed the angles yet. I was wondering about the heat waves, but how did it get closer?
A manual total station. Single sets.