@lukenz?ÿ Multiple of net profit or multiple of gross are both short hand ways to calc value. Analogous to pricing a boundary survey by the amount of...
@thebionicman Why? Edit: I do see a need for more standardized licensing requirements. While also acknowledging the stark differences in practice i...
@jitterboogie?ÿ Those things are also general -?ÿ things that would be included in my "etc." Rather not have a separate test in any of those.
@dmyhill?ÿ Nah... I'd rather not have to take separate tests for: boundary; grade level construction; topographic mapping; scanning; high rise constr...
If the value of the offer is good, do it. Reasons: Cash now is better than "hoped for" future cash. Exit strategy. Selling out to a larger firm (or...
Raising rates based on the number of RFPs received in the last 6 weeks.
I do not, if you want to argue about my fee.
"The easement as written does not adequately address the issue. Further consultation on this matter will require an additional fee."
@john-putnam obtuse, acute, or right angle?
same for me, I think since last maintenance
@party-chef?ÿ same
@ric-moore same.
@rj-schneider 'Round here, ADA ramp requirements make TBC critical. If the slope of the concrete from curb to top of ramp is greater that 2%, it wil...
@dave-karoly Nah... "Freestaion, also called resection..." Ghilani/Wolf Elementary Surveying text book describes method of resection as using angles...
@nate-the-surveyor hee,hee,heee...
@protracted To clarify, what I meant to imply by "unremarkable" is that to me, as a surveyor, this park is one of the most important land marks in th...