Murphy, post: 381475, member: 9787 wrote: "What are the problems that requiring recording would create?" It creates the means for municipalities to di...
I have brought this up on this site at least a half dozen times. A fellow surveyor was asked to provide a copy of an old survey for a new owner to use...
Holy Cow, post: 378362, member: 50 wrote: There is a very old story in ag country relating to a couple bachelor brothers of a specific ethnic origin w...
Alabama's summer seminar is at Perdido Key on the Gulf. Mississippi's is probably convenient to most surveyors, but you have to put up with all those ...
In 1978, I worked on a survey crew involved with a repaving project at the Birmingham airport. Much of the work was done overnight when it actually cl...
In residential subdivisions, I have found scratches on top of power boxes with no apparent reference corners set. In such cases if there is a curb ne...
A Harris, post: 361525, member: 81 wrote: 60d Nails are the universal hub and control point with a square of flag and bottle cap. In loose ground a 1/...
"The guy noted there were no records of section corners on our state's registration service and the clerk of courts did not have a copy of the old unr...
Andy Bruner, post: 357450, member: 1123 wrote: Steve, when is that to start. I'm working northwest of town (nearly to Jasper) for a while and I want ...
We are about to have about 1.5 miles of elevated I-20/59 in downtown Birmingham closed for two years while the decking is replaced. ALDOT's "plan" is ...
Brad Ott, post: 355630, member: 197 wrote: This is my rifle, this is my gun.......This is for killing, this is for fun!
Why would there be an as built plan survey of a road paving project? Were there grade changes?