Since you do not say, I assume the New Certification is to remove many or all of the encroachments'Your fee quote may be too low and you may want 100%...
Contact him yourself:[email protected] Emeritus Geodesy and Geomatics Engineering Engineering, Faculty of 1 506 453 5149 Fax: 1 506 453 4943 Head ...
paden cash, post: 414303, member: 20 wrote: I've watched the video clips taken from a helicopter and wondered if most viewers could actually appreciat...
Put the same data in to the same three CORS and you will get the same answer, because your answer is a mean of the three independently solved position...
There has been withholding of information to the public.Yesterday it was impossible to get any updated video. The few photos I found indicated the sev...
It is reasonable to expect delays in CORS stations submitting information to NGS. Any glitch in the automatic transfer of data almost always requires ...
Moe Shetty, post: 413666, member: 138 wrote: could someone check whether UFCORS data from yesterday is available? I can't seem to get the downloads.Sh...
The Oroville Reservoir is now 100% full and water is flowing over the emergency spillway.From what I see at least 300' of the regular overflow spillwa...
I got a response back from UNAVCO regarding the sequential outages on the GPS IIR-M satellites."hi Lawrence,This from Dr. Freddy Blume, head of our D&...
Mark Mayer, post: 413375, member: 424 wrote: If I followed your line of thinking to it's conclusion I would have to restore every monument of record I...
Mark,As a surveyor you have obligations to the adjoiners as well as your client. a house too close to a lot line, negatively affects the adjoining par...
Tim Reed, post: 413287, member: 420 wrote: Paul, even though the Emlid RTK system is L1 only, couldn't you essentially model the ionosphere using the ...
To be most useful L1 RTK requires base and receiver to be capable of ranging from the fixed SBAS (WAAS) satellites, which definitely improves the init...
Mark Mayer, post: 413234, member: 424 wrote: That will happen. I have decided not to make a map. If I did she would think that a survey had been done....
mav1958, post: 413076, member: 12168 wrote: The two schools that offer accredited survey programs in PA are far and farther for me. So after the last ...
It is not just the drive time, but the actual start time of classes.When I looked at advancing my survey education beyond my 6 college credits as a Ci...
Totals of Latitudes and Departures are in fact COORDINATES.I note that the point No. column was not used, tsk, tsk.Paul in PA
At 4' & 5' setbacks fire codes come into play. A wall too close to an adjacent structure, or where an adjacent structure is allowed, may be requir...