Activity
 
Notifications
Clear all
OleManRiver
@olemanriver
Registered
Joined: February 13, 2020 6:56 am
Last seen: November 18, 2024 7:22 pm
Topics: 116 / Replies: 2317
Reply
RE: Help opus

Thank you. I will confirm with the LS as it’s his data. And get that to you. I have personally seen some of those issues you have discussed in the pas...

9 months ago
Reply
RE: Trimble Access - Specify PRS?

Yes you could pull that data into opus projects. Even the prs or VRs stations if that’s what you need. I always process the stations in my rtk network...

9 months ago
Reply
RE: Trimble Access - Specify PRS?

Rover is correct. If you have VRS. Before going out down load and process static between the two or 3 stations holding the NCN station. You can then v...

9 months ago
Reply
RE: Carlson Survey Cad

Thank you all. I think the point history will work. I will have spend some time working with it for sure.

9 months ago
Reply
RE: Tips to inspire field crew?

You have been given some of the best wisdom in this thread. I mean some great advice. Here is some old sayings to help you remember. Lead follow or g...

9 months ago
Reply
RE: Isolate Points with Vertical Offsets

I did about the same as you going through the raw data. It only takes getting burned once before you truly pay attention to that stuff. I always took ...

9 months ago
Reply
RE: Isolate Points with Vertical Offsets

TGO that option was very nice. It was not hard to query for anything and get it out to excel for a custom type report or analysis for sure. I hope the...

9 months ago
Reply
RE: Carlson Survey Cad

Thanks I will give that a try tomorrow first thing. I am assuming that all data collector software today logs a date and time stamp in some way. With...

9 months ago
Reply
RE: Carlson Survey Cad

Yeah the do something similar here. I just have a situation where I was needing the date something was observed and my Trimble Business Center brain k...

9 months ago
Reply
RE: Carlson Survey Cad

Gotcha. Thanks. Yeah I create a layer as well with date. I just have one of those task that having the actual field date it was collected would be han...

9 months ago
Topic
Replies: 8
Views: 5
Reply
RE: Trimble receiver settings for static surveys

Yeah so once my receiver is set up I don’t have to go into the receiver to configure things. I use the data collector and set it up. Like I said I tur...

9 months ago
Reply
RE: Trimble receiver settings for static surveys

If sending to OPUS make sure you have the logging rate at an intervals of 30 seconds. This can be set up in the survey style. You can log data to the ...

9 months ago
Reply
RE: Help opus

I have not. I don’t have anything but his t04 file

9 months ago
Reply
RE: Help opus

I had one at the last place. It was an emergency rush. I was processing scan data and the laptop they had given me was not built for that. So they sen...

9 months ago
Reply
RE: Help opus

lol. It is a hard habit to break for me. I am aware so I am knowing how I am. Like GI Joe use to say knowing is half the battle. Sometimes I can’t tur...

9 months ago
Reply
RE: Help opus

I should have had him send me the rinex file to look at. I don’t have a rinex converter yet on the new work computer. So I was handicapped from doing ...

9 months ago
Reply
RE: Help opus

I will most definitely check dell out. I just have to wrap my head around the specs needed for lidar scanning cad platforms and such to make sure I ge...

9 months ago
Reply
RE: Help opus

Yeah I told him that for every job I did here I submitted it both ways and always had good results with the RTX. You are exactly correct it was always...

9 months ago
Reply
RE: Help opus

Thank you. We figured out opus was working but even today the files abort in opus both via rinex only and through the Trimble online processor. I don’...

9 months ago
Page 19 / 122