AI Assistant
Notifications
Clear all
Lamon Miller
Lamon Miller
@lamon-miller
Free
Joined: August 23, 2010 2:56 pm
Topics: 88 / Replies: 437
Reply
Reply
RE: Report of Survey (Gads, this is going on a public document!)

IMO it should read "hold all the original corners recovered".

15 years ago
Reply
RE: Estimate help needed.

The permit would take 5 years

15 years ago
Reply
RE: Orchard Layout

I had to do a similar project to yours although not anywhere as large. I borrowed the machine used to paint the baseball/softball lines from the loca...

15 years ago
Reply
RE: OPUS-RS vertical reliability

Most of my 2-5 hour OPUS solutions are followed up with an OPUS-RS solution on the same point. My results are generally between 0.3' to 1.0' differen...

15 years ago
Reply
RE: Echosounder

I use one between 15 to 30 days a year have tried many different systems. The one in the link below does the best job for me. A company 30 miles awa...

15 years ago
Reply
RE: WV Standards of Practice

Explain to them that in the future the existing monuments vs. the legal description may cause some confusion and could be a basis for legal action. ...

15 years ago
Topic
Replies: 0
Views: 390
Reply
RE: Construction stakeout control

What's your first task to start the job?Check between all control points for horizontal and vertical closure. If I find errors bring it to someone's ...

15 years ago
Reply
RE: Mapping of flood zones

I usually don't because we have new maps pending and structures that were in a C or B zone at the time of construction will now be in an A zone. In so...

15 years ago
Topic
Replies: 5
Views: 841
Reply
RE: Access to a cemetery

Sticking out of the curb in a few places is pieces of a wrought iron fence. It appears to be a family cemetery, because of the small size and is loca...

15 years ago
Reply
RE: Access to a cemetery

there is a curb all around graves

15 years ago
Topic
Replies: 15
Views: 562
Page 23 / 27