Reading RPLS is free for the whole profession. Members post, reply, and get the members-only rooms.
There are three monuments for this corner.?ÿ ?ÿ It wasn't relevant to my survey except that we shared the line.?ÿ I held the Concrete as it fit three ...
Does he see a white light, too??ÿ That's the ATR.....?ÿ I have noticed with my ts12 there is always the red light flashing, and I assumed it was the A...
Automatic Target Recognition??ÿ ?ÿIs it a robot instrument??ÿ Or, do you have reflector-less turned on?
I received a message from Artie Kay a few weeks ago, "Hi Don, How are your Sokkia gsr2700isx receivers doing after the GPS rollover??ÿ I have a pair a...
Well, around here, Plot plans are usually required by the building inspector to ensure compliance with zoning setbacks, etc.?ÿ ?ÿWe do those, as instr...
12 pack I meant to say! lol The stake is next to an old Concrete Bound (shown on a plan from about 1958) which I held for my Property line.?ÿ I ignore...
And that's what makes the profession interesting! Little quirks with every job.?ÿ
I'm with Warren on this one.
As we did for Sipson's Island, back in the day.
do the bi-weekly calibration (several times) when reminded by the robot.
I believe that the courts will respect "records kept in the normal course of business" regardless of how they're stored.?ÿ ?ÿI have testified numerous...