AI Assistant
Notifications
Clear all
dave-lindell
dave-lindell
@dave-lindell
Member
Joined: July 1, 2010 5:41 pm
Last seen: January 20, 2026 5:20 pm
Topics: 144 / Replies: 1540
Reply
RE: What would it take?

@stratman59 This reminds me of one of my favorite "urban tales" about surveying: A newbie who insisted he knew how to run a robotic instrument was s...

7 years ago
Reply
RE: Original Corners

@skeeter1996 "...a lawyer that would take any side for money." Isn't that a definition of a lawyer?

7 years ago
Reply
RE: What would it take?

And the people with the most money are the biggest skinflints.  

7 years ago
Reply
RE: Meanings can change over time

OK, I'll bite.?ÿ What's a turtle hull? (Maybe I have one and don't know it!)

7 years ago
Reply
RE: What would it take?

@just-a-surveyor I always heard it as "I have seen the enemy and it us" attributed to Pogo, the cartoon character.

7 years ago
Reply
RE: Volume Survey Uncertainty

@millshot259 Well, 40 meters by 100 meters is about 328 feet by 131 feet, say 43,060± square feet. Not quite an acre. 0.1 meter is about 0.32...

7 years ago
Reply
RE: Volume Survey Uncertainty

Is that 4,000 meters by 4,000 meters (3,950?ñ acres) or 207.5 meters by 207.5 meters (10.6?ñ acres) for us non-metric old fuddy-duddies?

7 years ago
Reply
RE: How hot is it???????

It is sooooo hot the corn in the field started popping and the bull thought it was snow and froze to death.

7 years ago
Reply
RE: Not exactly buttdialing

Maybe it was a nut case. Or a junk call.

7 years ago
Reply
RE: Daycare survey

While set up one day outside a fancy restaurant five young girls came out who obviously had ti many martoonies. One said, "Take our picture!" I said, ...

7 years ago
Reply
RE: Leveling technique?

I'm a fan off double simultaneous leveling using 3 meter rods with the 301.555 centimeter offset between the left and right sides of the Invar strip. ...

7 years ago
Reply
RE: Leveling technique?

You could always run one set in feet and the other in meters if you could figure a way to use two rods, or one with front-feet and back-meters.

7 years ago
Reply
RE: Resection procedure in the modern era

"Original" three-point resections were done by measuring the two angles only. Now a person can measure the distances with ease, so a two point will gi...

7 years ago
Reply
RE: Static GPS control and on the ground traverse

"Least squares" by its very name implies that the sum of the squares of the residuals is minimized. It does not adjust the measurements "the least". ...

7 years ago
Reply
RE: Bad day

One of the city crews left a backsight out and drove into the office without it. It just so happened that the supervisor drove that way home, recogniz...

7 years ago
Reply
RE: I Hated To Put A Hole In Their Brand-New Pavement...

I was accosted one time by the Director of Public Works for the city of La Habra Heights (I think he was also the deputy dishwasher and chief janitor)...

7 years ago
Page 43 / 85