Reading RPLS is free for the whole profession. Members post, reply, and get the members-only rooms.
Last seen: October 12, 2026 7:41 pm
The rounded precision should reflect the expected accuracy, typically with one questionable digit.
I'm sure there are cases like two "60 ft" lots measure a total of 119.5 ft. Does the first lot resurveyed get the full deed distance?
It seems to be associated with railroad track alignment. I would think it would be obtained from the equipment manufacturer.
When you stake the deed, how do you know what to hold to get started?
Rounding is an intentionally introduced error.
That post by Kent was in 2010 and he hasn't posted here since 2017, so your query will not be successful.
Play it Sam. But you are mixing movies and that one didn't happen in Kansas.
It is difficult to prove undisturbed. I thought the rule was to accept it unless you had strong evidence it was disturbed. I don't see it as a foreg...
Iron signal found within base of double-trunk tree and set nail over signal to perform measurements.
They should give the adjoiner permission to keep the fence until (and only until) it is replaced, if they will recognize the surveyed line.?ÿ That kil...
If the guy hadn't been trained, then yeah it's not his fault. ?ÿIf he had been taught how to do it and ignored instructions, it would be fair for him...
The antenna will contain a pre amplifier to boost the strength. That is why signal loss in the coax is usually insignificant. The receiver sends power...
In every GNSS receiver algorithm I've read about he position is computed from the differences in arrival of the sat signals at the antenna. The delay ...