Activity
 
Notifications
Clear all
Adam1
@adam1
Registered
Joined: Nov 17, 2016
Topics: 1 / Replies: 15
Reply
RE: Hub & Tack curb staking

I still think SMIƒ??s Construction 5 program was the best at staking out roadways. You could stakeout a station/ offset and it would give you 2 option...

6 years ago
Topic
Replies: 0
Views: 2
Reply
RE: Are all reflective targets the same?

I recently leared about just this topic. The short answer is no, not all prisms are the same quality. However, the major factors are the total station...

6 years ago
Reply
RE: Work for two companies?

Like some many others have said, check your state reg's. In Tennessee, you can only stamp work for one company that provides surveying services to the...

6 years ago
Reply
RE: Three section prism poles gradutated in feet?

Ever since Seco was purchased by Trimble, I have heard and had nothing but bad things.?ÿ tribrac's are shipped without being properly aligned. Prism p...

6 years ago
Reply
RE: Awful Description - No remaining "stakes"

Ive just skimmed through these posts, but it sounds like a classic case to use a Boundary Line Agreement. If no evidence can be found and the boundary...

6 years ago
Reply
RE: Leica GS15 Base Connection issue to Trimble Machine Control

Does the low accuracy occuraround the same time of day?Or does it only occur when the oporator switches from course to fine grading??ÿDoes this proble...

7 years ago
Reply
RE: Carlson Field to Finish Question

Yes I believe you can. In the Edit Field Code Definition set up your FIR code as follows: Code = FIR Full Code Name = "whatever you want" Description ...

7 years ago
Reply
RE: Trimble SPS series total stations

I have two SPS 930's and run we use Trimble Access and the older Survey Controller to operate these units. If you use SCS900 to operate an SPS 930 you...

7 years ago
Reply
RE: Carlson question

If all you want is a point symbol:Type in the command: ptsymDrop down menus: draw>symbols>insert symbols

7 years ago
Reply
RE: Battery Powered Rotohammer

I can confirm A Harris's comment of the Dewalt 18V hammer drill. I have used this drill with a 5/8" bit to drill concrete curbs, asphalt driveways and...

7 years ago
Reply
RE: Slope Stationing with Trimble Access

Yes it is possible. You will need Trimble business center to import the line work from Carlson DWG. Then you will need to export a RXL file I believe....

8 years ago
Reply
RE: Better you than me

All I hear is Profit, Profit, Profit. Tight time line, lots of work = big money.

8 years ago
Reply
RE: Licensed in which states

KY, TN, VAMostly work in Tennessee.

8 years ago
Reply
RE: Ring, Ring

Let's not forget the rule of supply and demand. My answer, " I might be able to getting someone there today. But being last minute, the price will hig...

8 years ago
Page 1 / 2