It takes 6 surveyors to screw in a lightbulb, 1 to screw it in and 5 to calculate the offsets to its true position.
Dave Karoly, post: 414127, member: 94 wrote: It takes 6 surveyors to screw in a lightbulb, 1 to screw it in and 5 to calculate the offsets to its true position.
But what about the note keeper? Which one had to clear line? And what about an apprentice? Gotta have an apprentice. Flag man? And an electrician.... Wait a minute. Surveyors? Screwing in a light bulb? The union rep will hear about that.
Dave Karoly, post: 414127, member: 94 wrote: It takes 6 surveyors to screw in a lightbulb, 1 to screw it in and 5 to calculate the offsets to its true position.
And then the 7th guy walks in and questions the true position
BK9196, post: 414135, member: 12217 wrote: And then the 7th guy walks in and questions the true position
Feet to meters. Grid to ground. SPC to local. Slope to horizontal. ITRF to NAD83. US ft to International foot. Temperature not corrected. No barometer on site. Happens a lot. Need a contract inspector too.
Nate The Surveyor, post: 411835, member: 291 wrote: To start an argument?
Just one.
Unless he can find someone else!
(Cause he'll argue with himself....)🙂
N
I Agree lol