Notifications
Clear all
@sireath There are laser designed specifically high rise control. I've done inside core layout on my last 3 highrises with them.
You have to get solid, tight control inside the core right after the core slab is pored, prior to 1st wall lift.
The Online Resource for Land Surveyors