I'm assisting another firm with a control project in which they're making RTK observations using 5800 and R8 receivers and (I think) Survey Controller. They're providing daily .job files to me, which I bring into TBC. I understand how to control point merging, but I haven't figured out how to prevent RTK vectors from getting duplicated without individually deleting the duplicates. Any hints?

Thanks!

 
Posted : 29/11/2015 3:09 pm
(@jimcox)
Posts: 1951
 

Remove ALL the vectors and replace with missing line between the merged controls as needed ?

 
Posted : 29/11/2015 10:02 pm
(@jim-frame)
Posts: 7277
Topic starter
 

jim.cox, post: 346459, member: 93 wrote: Remove ALL the vectors and replace with missing line between the merged controls as needed ?

I want to keep all the RTK vectors so I can adjust them, but I only want the original of each one -- I don't want to import the same vectors repeatedly.

 
Posted : 29/11/2015 10:20 pm
(@ridge)
Posts: 2702
Registered
 

Search these topics in the HELP:

Import Multiple File Versions

Preconfigure Options for Importing Multiple File Versions

 
Posted : 29/11/2015 10:56 pm
(@jim-frame)
Posts: 7277
Topic starter
 

LRDay, post: 346461, member: 571 wrote: Search these topics in the HELP:

Import Multiple File Versions

Preconfigure Options for Importing Multiple File Versions

I've read those. The Import Multiple File Versions topic states that with Preserve Office Edits, "if the same object exists in both versions of the file, the existing version of the object is the one that is saved." But when I choose Preserve Office Edits I end up with multiple instances of the same RTK vector, one for every version of the file I import (the importer appends a dash and an increment number to the copies). I've monkeyed around with different merge options, and still get multiple vector copies. I'm stumped.

 
Posted : 30/11/2015 6:47 am
(@plumb-bill)
Posts: 1597
Registered
 

If you're receiving job files that are started new each day, there should be any duplicates?

 
Posted : 30/11/2015 6:52 am
(@cr_pls)
Posts: 26
Registered
 

I was having the same issue with duplicate points and ended up going to Settings/Computations/Point Tolerances and changed the Merge on Import to "By Station Point", this solved my issues and only imports new vectors. I use DC files to import new points though, that way we have a log of a digital field book and I'm able to make edits if needed, there's no way to make edits to a job file outside of TBC.

 
Posted : 30/11/2015 7:13 am
(@jim-frame)
Posts: 7277
Topic starter
 

Plumb Bill, post: 346489, member: 226 wrote: If you're receiving job files that are started new each day, there should be any duplicates?

The field crews are using the same job files each day, adding more observations to them. That's what I always do; is that unusual?

 
Posted : 30/11/2015 7:28 am
(@jim-frame)
Posts: 7277
Topic starter
 

CJRob1693, post: 346493, member: 7671 wrote: changed the Merge on Import to "By Station Point", this solved my issues and only imports new vectors.

That doesn't seem to be working for me. I set "By Station Point" in the project options, and tried every variation of the merge dialog (disalbe on merge, overwrite, preserve, ask) but keep getting duplicate vectors.

 
Posted : 30/11/2015 7:31 am
(@plumb-bill)
Posts: 1597
Registered
 

Jim Frame, post: 346497, member: 10 wrote: The field crews are using the same job files each day, adding more observations to them. That's what I always do; is that unusual?

It would be highly unusual to the way I work. I have the crews link the file from the previous day, this only copies in the needed control points.

This allows me to process the project as it comes together daily. If one file will contain all of the information, it is easiest to just process it once at the end of the project.

Or use project explorer and manually delete previous data. It seems to me that adding into the same file continually will always create extra work, though.

It wouldn't be near as cumbersome for a solo operation, but as you add crews it becomes more aggravating exponentially.

 
Posted : 30/11/2015 7:32 am
(@cr_pls)
Posts: 26
Registered
 

Our typical work flow is to upload a job file and link the control / section corners, then at the end of the day we use data transfer to download the DC file (which includes the job file) into a specific folder. I should also mention that we require the crew chief to put the date and their initials on each uploaded job file, so the downloaded DC file would be NDak113015CR. This allows me to see which crew chief worked on that specific job and which day they were there. Any time we have new control I'm able to import the DC file into TBC, using the settings from above and don't have duplicate points or vectors. I like having the the DC files because it's our digital field book, it becomes hard to write in a physical field book when it's -20 outside. We also use a specific point range for each crew chief and I'll renumber any control after its been imported. Hopefully this helps, it took some trial and error for us to come up with an easier workflow for our guys.

 
Posted : 30/11/2015 8:18 am
(@jimcox)
Posts: 1951
 

Plumb Bill, post: 346500, member: 226 wrote: I have the crews link the file from the previous day, this only copies in the needed control points.

That is how we do it too. A separate file per crew per day, each day linked back to one control file for the whole job

 
Posted : 30/11/2015 8:48 am
(@ridge)
Posts: 2702
Registered
 

I've had this problem but the " Preserve Office Edits" works for me. I also always select "keep the TBC control over the use the imported file -whatever."

There is some setting somewhere that needs to be changed I suppose. You could just delete the previous download and then download the new but then you would lose any adjustments you may have done. Seems like the more features and complexity there is in the software the more trouble it may be to use it.

Its easy to delete any previous download file in TBC. Sometimes things get sort of clogged up and I'll do that - delete some of the imports and just reload what I need. TBC is getting like any other CAD, you need to use it a lot to keep current on how to use it. I'm actually encouraged because I think it is finally going to make me just use TBC for everything to final product and replace my TerraModel. I really like TerraModel but its in a time warp since about 2001.

I spent literally months reading the manual and testing to learn TerraModel. Sorta going to be the same with TBC except I know what it should do just need to discover the right clicks.

 
Posted : 30/11/2015 9:34 am
(@makerofmaps)
Posts: 548
Registered
(@jim-frame)
Posts: 7277
Topic starter
 

makerofmaps, post: 346538, member: 9079 wrote: Maybe this will help.
http://surveysupport.seilerinst.com/2015/10/20/trimble-access-export-only-one-days-work/

Alas, that technique is also aimed at the user who only wants to see coordinates.

Trimble data collection software doesn't seem very friendly toward those who are more interested in observation data.

 