Activity
 
Notifications
Clear all
partychief3
@partychief3
Registered
Joined: Aug 26, 2014
Topics: 3 / Replies: 84
Reply
RE: Client not happy with bill

I bet if you send her a bill for your time on this next consultation/dead horse flogging that will be the end of it.I am sure you will never make her ...

9 years ago
Reply
RE: Would you...

I feel for you Williwaw and do not envy your position. The horns of your dilemma are sharp indeed. If you take a stand against sloppy/egotistical surv...

9 years ago
Reply
RE: Table A item number 9

And don't forget that ADA also defines a maximum slope.I want to echo Bill93's point too.

9 years ago
Reply
RE: Clockwise or Counter Clockwise? Inquiring minds want to know.

rfc, post: 334616, member: 8882 wrote: I'd know better than to argue with the venerable Paden, but....Isn't the appropriate colloquialism something sl...

9 years ago
Reply
RE: New Desktop workstation

I recently built a new desktop.After years of AMD multi-core ( Athlon 64 x2, Phenom II x2) I went back to Intel.The Haswell chip is in second generati...

9 years ago
Reply
RE: shortage of surveyors

Too late! Surveying now belongs to whoever is selling textbooks to four-year schools.:poop:Most of the kids in "Geomatics" are flunking civil eng cour...

9 years ago
Reply
RE: shortage of surveyors

It certainly killed my desire to get registered.And we should slap the taste out of the next mouth that says "GIS is surveying too"Maybe I can get tha...

9 years ago
Reply
9 years ago
Reply
RE: Some places surveying has taken me

Richard, post: 333910, member: 833 wrote: now a random few.One of my first jobs was to climb the tower of the Batman Bridge and check tension on huge ...

9 years ago
Reply
RE: What is it?

Is it, in fact, a nomadic rod? sorry, my self control sprung loose.

9 years ago
Reply
RE: Proper way to stake a slope

Seeing that at one time my place on the totem pole is being the guy who carries all that lumber on remote sites, Good on ya mate.:beer:

9 years ago
Reply
RE: Things not to do if you're a button pushing layout crew for a construction company

That is a LOT of changes.I have been through there when I-10 was being built (70's) and then on the Sunset Limited in 2005.I think I saw the train sta...

9 years ago
Reply
RE: Volume Calculations

Dan Patterson, post: 333371, member: 1179 wrote: I sometimes create points from the design surface for layout (if I have it and if it's done properly)...

9 years ago
Reply
RE: Robotic Total Station boundary surveying WV

gschrock, post: 333189, member: 556 wrote: If you do go robotic, and also GNSS there are advantages in being able to use them integrated (i.e. same DC...

9 years ago
Reply
RE: Robotic Total Station boundary surveying WV

Lugeyser, post: 333163, member: 1249 wrote: John, (snip)I like the idea of not having to pay payroll taxes on it and not having to worry about whether...

9 years ago
Page 1 / 6