Activity
 
Notifications
Clear all
j-penry
@j-penry
Registered
Joined: July 7, 2010 6:56 am
Topics: 462 / Replies: 934
Topic
Replies: 6
Views: 4
Reply
RE: One heavy ring, ring...

Any idea what this surveyor intended to do as far as setting corners or was his plat going to follow your lead? I agree with MightyMoe on the offset ...

9 years ago
Reply
RE: Benchmarks not in NGS Database

USGS Publications (historic)Nolton, what area do you need and what is the year of the network? I can get them for you.

9 years ago
Topic
Replies: 11
Views: 5
Reply
RE: Page Base (Again) Computations

Have you come across anything that gives a distance of the base without taking into consideration the actual ground measurement? They would have had ...

9 years ago
Reply
RE: Colloquialisms have no place in precision work.

It appears that JOHN NOLTON has now signed up under yet another name.

9 years ago
Reply
RE: Geodetic Base Line Sign Dedication

Intermediate points?I would say there is a good chance of finding some of them, but probably none undisturbed. The first one southwest of Page NE Bas...

9 years ago
Reply
RE: Geodetic Base Line Sign Dedication

Page Base Link USC&G Annual Report 1901

9 years ago
Reply
RE: Geodetic Base Line Sign Dedication

Page Base Link USC&G Annual Report 1901Ground distance: 8251.7569mSea Level distance: 8250.9880mPerhaps next spring I will search for the interme...

9 years ago
Reply
RE: Federal Manuals of Instruction for Mineral Surveys

Thanks Gene. Very interesting stuff to have handy!

9 years ago
Reply
RE: Mini Rodman

I love it! What a great tool.

9 years ago
Reply
RE: Aluminum Cap Failure

One of the issues we have, particularly in the northern part of the county, is the salinity of the soil. I have seen 2" aluminum caps that were burie...

9 years ago
Reply
RE: Geodetic Base Line Sign Dedication

Page Base Line - Then/NowNE Base - 580.1 meters NAVD88SW Base - 626.231 meters NAVD88

9 years ago
Reply
RE: Geodetic Base Line Sign Dedication

Page Base Line - Then/NowThe Page Base Line was measured to be 8251.7569 meters in 1900. NGS has current NAD 83(1995) positions of:NE BaseN 42°28'53....

9 years ago
Reply
RE: Geodetic Base Line Sign Dedication

It is my personal belief that there are no instruments available to the general surveying community today that could remeasure the geodetic baselines ...

9 years ago
Topic
Replies: 42
Views: 5
Reply
RE: Survey Disk Stamping Jig

If you can make enough of an indentation on the first blow, then the die will fall back into the same indentation for a harder blow. I've had to stam...

9 years ago
Reply
RE: Survey Disk Stamping Jig

The die does need to be adjustable to not only go around the outer ring(s), but also horizontally across the middle such as placing section numbers in...

9 years ago
Topic
Replies: 34
Views: 7
Reply
RE: The Downside of Benchmark Hunting

What other profession would tolerate the theft and destruction of items essential to their work? Would a power company permit the theft of older mete...

10 years ago
Page 15 / 70