Last seen: November 19, 2024 5:22 am
MSHA and wheel chocksHad to do some work at local limestone quarry. We are laying a 1400' pipe through a spoil area. I had to set some control to ru...
I remember hearing a long time ago it had something to do with a woman holding a baby in one arm.
Yeah, should have had my daughter film it. Luckily mom saw it before she sat down. It could have turned out more like this:Had a buddy helping do so...
I enjoy the wildlife, usually. However, there are times.....Mom lives just down the road. She called me Thursday morning about 6 just as my daughter...
Assuming this is required after its all together?Would it be possible to stretch a wire or 2 on each side attached to the truss at each end and measur...
The rest of the storyWell, after about 8 hours of it is was over. Got a good night's sleep and feels fine today. One of the folks posting in that li...
That's exactly my method as well.I am reminded of a state inspector back in about 1978 who was going to show me he knew how to set up a transit using ...
> Your original post still leaves a lingering question. The CAF you posted is less than 1 and you stated you divide ground by the CAF to get Grid. ...
Not exactly survey related, but my personal favorite. All 3 have worked with me during summers off.Daughter 2 after graduation yesterday with BS in C...
Yeah but they spelled it wrong. Around here its Fuquaruie. I think maybe thats the French spelliing.
Looks like 90 years may have passed
Exactly. Design is what it is and probably fits whats on the ground. Just need to find or create some control that agrees with it for layout. Hopefull...
Not gonna happen. Work order already received. Boxes and pipe ordered and being delivered. Traffic control up. This is not unusual that there would ...
Already did that and found nata. As for the scale factor issue, Ky uses 0,0 as the origin for scaling. The scale factor for each project is based on w...
That fixed itThanks Wendell.
Got the email. No link attached. Getting same message on laptop.
Are you setting the 5' horizontal offset in before you stake it?