Last seen: June 4, 2026 6:10 am
I didnt notice the last part of my post got cut off. The machine uses gps tied to the project control for location and a 1" total station for grade. T...
In the middle of this one now ?ÿits a double crossover diamond under I-24 in Paducah. Interstate icrosses over to the right of this sheet and then the...
Do a station setup as normal, then go to Measure/Station Elevation. The point you want to shoot has to be stored, then take the shot and store it.?ÿ
One of the projects I'm working on is a double crossover diamond intersection off an interstate onto the busiest 4-lane in west Ky. We got the j...
Wife and I go to the local Mexican joint about every weekend.?ÿ No matter what we order it seems like there is always a tinfoil wrapped pack of tortil...
Chase had a car equal to Harvick, and better at the end of a run. Hamlin screwed it up for him again.?ÿ On a side note, was in Vegas for Dimensions th...
Agreed. Was at the NASCAR race in Phoenix. Perfect temperature, great race. Eating now at spot in town, need a jacket to sit outside.?ÿ
I was there, attended several sessions and the offsite expo. Most interesting thing I saw was a presentation about the Turkey Creek Tunnel project in ...
I had a developer client that I fired, but then he came around.?ÿ My office was in my house, and he was there raising hell over something I had nothin...
We always used 50' on highway work, unless there was something non-typical going on.?ÿ Now its every .01' with machine control.?ÿ If the operator has ...
We also had one as a loaner with SCS900 software and it wouldn't connect to a SPS930 total station.
Not to cut you out of a job, but if I had to plant that many plants in worked ground Id modify a tobacco setter and put it on a tractor with autosteer...