This is shocking news. I almost always enjoyed reading his posts, and I'm pretty sure I would have liked him as a person. RIP, Steven.Brad
We use a 16 oz. with a gammon reel, and once in a while use it as a hammer, but not often.But back in the day, when I did a lot of construction stakin...
Oh, and imagine the workers that had to install the planks the guy's walking on!Highrise and midrise building construction surveying is a very special...
> What would be your charge per piling to stake 1000 pilings in a 3,600 sq. ft. area?> > How many could your crews set in a day, including ho...
> I’m trying to work out sort of a complex description where there are multiple "together with" and "except thereof" parts to a parcel (needs to be...
Along a stretch of two lane highway about 10 miles south and mostly within sight of the wettest spot on earth, Mt. Waialale. It never really gets old.
Carl, be really careful with that type of heat in the field. But you know that...
Dave...That was the way I was looking at this too. The second party would get the remainder of the parcel, and only a survey on the ground would deter...
My first job in surveying was with a big engineering company in San Diego that also ran about 10 crews at the time. I was hired to make blueprints and...