Hello, lately I had several problems with the download of Locus data, when verifying the data, has a date error, this marks the year "1997".
This data can still be used or modified to have the correct date.
I appreciate any comments on this topic.
You probably will need an old xp machine. And, a ir wire.
And, learn to modify the date.
You can do it.
Nate The Surveyor, post: 434840, member: 291 wrote: You probably will need an old xp machine. And, a ir wire.
And, learn to modify the date.
You can do it.
Okay, but how can I change them?
Maybe in rinex.
I dont know.
But, others are doing it....
Nate The Surveyor, post: 434844, member: 291 wrote: Maybe in rinex.
I dont know.
But, others are doing it....
Do you know any users of this community that can help me ?.
Some are doing with the L-1 units from trimble.
Nate The Surveyor, post: 434849, member: 291 wrote: Some are doing with the L-1 units from trimble.
I had found some posts that talk about altering or modifying them, but I believe that I am doing wrong said process.
I've never done it.
I found web pages about how to modify them, but it is good to perform this process ?.
Im pretty sure you have to do it.
I have done this with an old Ashtech receiver. Download the files and convert to Rinex. Then edit in Notepad++. There is a post a few months back from Paul in Pa going through what to change in the week and day numbers. If I find it later I will link to it.
It's a bit of a pain to have to do so I think it's time for you to get a couple of new receivers
TEQC has an option to force the correct week number to be used in the conversion to RINEX, and that painlessly fixes the date for my old Trimble receiver.
If I recall correctly I was making changes the hard way, because I had some hangups with teqc. teqc is always being improved, so take the time to learn all you can about it.