(@chris-mills)
Posts: 718
Registered
 
Posted by: @kevin-hines

....even the piping connected to the gutter downspout is going up hill according to the photo of the finished garage.

Optical delusion!

?ÿ

 
Posted : 01/07/2022 2:03 am
(@jitterboogie)
Posts: 4275
Customer
 

@jim-frame?ÿ

Indeed. Although, we're only seeing the view with door down.?ÿ?ÿ

Maybe we don't know the slope from the garage meets or exceeds the driveway.

????

 
Posted : 01/07/2022 4:22 am
(@larry-scott)
Posts: 1049
Registered
Topic starter
 
8B56DDEB B064 4D83 9C45 696D2653C8FC

A92B2847 90FC 44D9 90E1 11D8B4AC4B0F

@jitterboogie?ÿ

The edge of pavement is 17 feet from the garage door. The garage floor is called out as 500 ft. The edge of pavement at centerline garage is 504 ft. I think they may have raised the garage floor 1 ft or so.

The architectural elevation drawing was submitted for permit. The architectural topo shows the street as level along centerline of pavement and called out to be 500 ft.

The plan shows the driveway as useable for 2 car guest parking. There is no street parking in the subdivision due to its hillside layout.

 
Posted : 01/07/2022 4:51 am
(@larry-scott)
Posts: 1049
Registered
Topic starter
 

@jitterboogie?ÿ

from Eugene building permits

https://pddfiles.eugene-or.gov/documents/ebuild/2448469

DBB13BBD 1443 438F 807F 78A7CF702D5D

?ÿ

 
Posted : 01/07/2022 5:10 am
(@jitterboogie)
Posts: 4275
Customer
 

@larry-scott

It could only be better if this was designed by my ex wife the artichoke.

500?ÿ for FF.?ÿ WEIRD.

Is that based on a subdivision elevation or just a random FF to make the math easy for the not inclined?

Yes, that might be a triple entendre there. ?????ÿ

?ÿ

Edit: I'm not poking fun at your dilemma and just opened the topo with actual elevation data.

?ÿ

?ÿ

 
Posted : 01/07/2022 5:11 am
(@larry-scott)
Posts: 1049
Registered
Topic starter
 

@jitterboogie?ÿ

The architect site plan shows 21 ft to edge of pavement. But itƒ??s about 17ƒ?? as-built. So loosing 4ƒ??. I think the foundation mayƒ??ve been staked 4ƒ?? out, and 4ƒ?? low. And the street grade assumed level, instead of the 13% grade of the hillside development.?ÿ

 
Posted : 01/07/2022 5:17 am
(@jitterboogie)
Posts: 4275
Customer
 

@larry-scott?ÿ

I'd like to see the stakes for the footer/foundation and see if the work matches the stories left behind.

?ÿ

 
Posted : 01/07/2022 5:22 am
(@larry-scott)
Posts: 1049
Registered
Topic starter
 

@jitterboogie?ÿ

The construction began several yrs ago. The contractor abandoned it when it was not even 1/2 finished because the buyer backed out when he saw the fƒ??up

 
Posted : 01/07/2022 5:41 am
(@jitterboogie)
Posts: 4275
Customer
 

@larry-scott?ÿ

Understood.

It's not impossible to fix just expensive and not free.

My biggest concern was when you mentioned it was open to the Oregon Eugene climate for so long.

That's a good reason to be pissed alone.

 
Posted : 01/07/2022 5:55 am
(@larry-scott)
Posts: 1049
Registered
Topic starter
 

?ÿ

757605D5 A29E 4598 93F8 7BD1DAB41E06
CCB65111 AE8E 4249 870D 29CB0793B6D8
4266B401 F929 473B 926B 8060158060C4
6E39F774 421C 4C93 BEB6 35A9B231305B

@jitterboogie?ÿ

There was some mitigation, but by and large, out of sight out of mind. It was inspected by the city, but dunno what level of disclosure will be presented to a buyer.

And thereƒ??s no street parking, only guest lot is quite a long walk away. So, if 2 in the garage can be sorted any guest canƒ??t park alongside.

Someone will probably buy it with a 2-3 year idea of selling, imo.

The current owner bought it unfinished, partially framed, specifically to flip, assuming itƒ??ll sell at a profit. So to avoid going underwater he did the min. And I believe the flipper bought it sight unseen.?ÿ

?ÿ

 
Posted : 01/07/2022 6:10 am
(@jitterboogie)
Posts: 4275
Customer
 

@larry-scott?ÿ

Wow.?ÿ I suppose you could coat everything with Kilz.

Some people will buy anything.

????

 
Posted : 01/07/2022 6:50 am
(@flga-2-2-2-2-2-2-2-2)
Posts: 7403
Registered
 

Yƒ??all understand that no matter if the plans were: screwed up from the beginning, the contractor has dyslexia, the grader operators Great Grandmother died (for the third time this year) thus causing him/her to grade the wrong lot, etc..yada, yadaƒ??

But..................the Surveyor is going to get blamed. ?????ÿ

 
Posted : 01/07/2022 7:24 am
(@norman-oklahoma)
Posts: 7610
Registered
 

The plat. I've never seen anything like it.?ÿ The subject lot is #436, shown on sheet 3. Recorded in 1978, design 2018, construction recently??ÿ Private streets. What could possibly go wrong??ÿ

 
Posted : 01/07/2022 7:25 am
(@larry-scott)
Posts: 1049
Registered
Topic starter
 

@flga-2-2?ÿ

Too late for blame and law suits. The city didnƒ??t condemn it. It was sold to the flipper as-is.?ÿ

 
Posted : 01/07/2022 7:28 am
(@flga-2-2-2-2-2-2-2-2)
Posts: 7403
Registered
 
Posted by: @larry-scott

It was sold to the flipper as-is.?ÿ

Who will flip/sell it to another "flipper" and then the problem starts all over again. (and the lawyers make more money) ?????ÿ

 
Posted : 01/07/2022 7:33 am