Notifications
Clear all

Creating Field2Finish

48 Posts
21 Users
0 Reactions
6 Views
(@blitzkriegbob)
Posts: 406
Registered
 

Reading this thread is very interesting. I think we can safely say that there is no one right way of performing this function. One needs to establish an SOP that works for them. If I think back to my first surveys doing F2F, I cringe. I was self taught, so I did a lot of stupid things starting out on my first few surveys.

 
Posted : 12/02/2021 5:19 pm
(@jim-frame)
Posts: 7277
 
Posted by: @norman-oklahoma

I have eliminated top and toe codes from my list and substituted a single breakline (BL) code.

I mostly do the same thing (though I use GB for "grade break" instead of BL), except sometimes when cross-sectioning a ditch with a lot of breaklines.?ÿ In that case I might start with TOP1, then GB1, GB2, etc. and finish with TOP2.?ÿ It helps me keep the strings straight in my head.

 
Posted : 12/02/2021 8:53 pm
(@mark-mayer)
Posts: 3363
Registered
 

@blitzkriegbob

Part of it is personal preference and part is local conditions. For instance, headwalls, box culverts, and concrete lined ditches are a big deal in Oklahoma. They hardly exist in Oregon.

?ÿ

 
Posted : 12/02/2021 9:39 pm
Page 4 / 4