Activity
 
Notifications
Clear all
tim-v-pls
@tim-v-pls
Registered
Joined: July 16, 2010 2:25 pm
Topics: 22 / Replies: 382
Reply
RE: Mini prism school of thought (Help)

I've used this type mini-prisms for years. (I guess decades even...) that video link posted by Rover83 reminded of a couple things. Thanks.

5 years ago
Reply
RE: Exporting Quickbooks Estimate to Excel

@john-putnam Maybe something from the Reports PulldownJob Costing; Job Estimates vs Actuals SummaryorJobs, Time, Mileage; Time by Job Summary

5 years ago
Reply
RE: Exporting Quickbooks Estimate to Excel

Maybe...? Estimates and change orders button. "Report" tab, estimates by job button. Up top there's a Excel pull down - Create New Worksheet ?ÿ

5 years ago
Reply
RE: link dwg to site control using shared coordinates

If I understand your question here's how I'd do it... You have a design drawing in an arbitrary coordinate system with common points in your real wor...

5 years ago
Reply
RE: Subcontractor work ticket template

@firestix sure - wth, why not...    

5 years ago
Reply
RE: Tower Monitoring Carlson SurvCE questions

Temperature will no doubt have an effect on a tower. I would note temperature with every report. Additionally I'd want to use the same equipment and ...

5 years ago
Reply
RE: Subcontractor work ticket template

Old school way, form in triplicate. sent you mine in pm. We use text and email these days for confirmation. I've looked at T&M apps and like wha...

5 years ago
Reply
RE: Contractor Machine Control Use/Misuse

I'm not concerned at all. They'll learn from their mistakes like we all do. And probably make way more money along the way.

5 years ago
Reply
RE: Cash Flow woes

@holy-cow When I was 10 or 11 years old I asked my dad what it took to start a business. He held his hands up like he was holding two huge watermelo...

5 years ago
Reply
RE: Cash Flow woes

@bstrand If the word "grovel" is the deal breaker, call it something else... I would say, be humble when humility is required.  

5 years ago
Reply
RE: Cash Flow woes

@brad-ott Maybe reach out well before you hit the 3 month mark. If your goal is 3-4 weeks (I thought I read that somewhere), then when you get to, sa...

5 years ago
Reply
RE: Cash Flow woes

Perhaps look at getting a line of credit to smooth out the ups & downs of cash flow. Well managed debt is a positive thing for a business. ?ÿ Ma...

5 years ago
Reply
RE: Cash Flow woes

@brad-ott No, don't work more hours. That's not the work smarter solution, it's the work harder solution. Maybe sub out the drafting?  

5 years ago
Reply
RE: Lots of private messages with no content?

@bill93 Yes. Messages with no content. ?ÿ

5 years ago
Reply
RE: Tripod Data Systems TDS-480 Environmental Case

@alexander1190 I'm confused. HP48 is powered by replaceable AAA batteries. Maybe I'm not discussing the same item.

5 years ago
Reply
RE: Tripod Data Systems TDS-480 Environmental Case

it's been years and years, but from memory: there's a male plug in the case to connect to the HP48. Then 9 pin female connector outside the case to co...

5 years ago
Reply
RE: Staking out and how to report it

@fobos8 A cut sheet shows cuts/fills of as-staked elevations compared to design elevations. Provided to contractor as a backup to markings on stakes....

5 years ago
Reply
RE: Staking out and how to report it

Like David said, far and above what the contractor wants. They won't look at it. The assumption and expectation is that it's staked correctly. Keep th...

5 years ago
Reply
RE: Cut/Fill Reports

@cameron-watson-pls Six minutes total... world record pace I don't know if I can match, but now it's a goal 🙂

5 years ago
Page 16 / 21