I used NearSite because the whole the GS16/Captivate can run MAX I don't believe it's an option on the R8/SurveyController so NearSite was just to kee...
leegreen, post: 413955, member: 2332 wrote: Who did the scan a year ago? Why was the control not established during the scans? Seems they would have h...
FrancisH, post: 413759, member: 10211 wrote: hey if he thinks 2 laborers can do your work then let him do it. he will call you after a few days. i don...
FrancisH, post: 413370, member: 10211 wrote: Sorry, it seems that everyone is trying to make a simple job more complicated?Complete scan data per floo...
eddycreek, post: 413186, member: 501 wrote: You said you had closed a traverse around the building. And there were windows that could be partly opene...
eddycreek, post: 413182, member: 501 wrote: I am not familiar with this type equipment. How much vertical distance are they accurate for? May have a...
timdoggy, post: 413179, member: 12364 wrote: Using a right angle eye piece, You can double center the lines up, then split the difference. This works ...
timdoggy, post: 413173, member: 12364 wrote: I've done a few of these and it takes some creative thinking. We do everything we can to get the core ho...
party chef, post: 413170, member: 98 wrote: I only meant random as in not trying to stay on grid for the mark to mark traverse, not that it would be i...
leegreen, post: 413167, member: 2332 wrote: Make a jig to set in the window sill to transfer control.I may be your area next week. Maybe I could stop ...
leegreen, post: 413160, member: 2332 wrote: I was also thinking about running control through the window sills. Even it you can't get back, can you go...
party chef, post: 413159, member: 98 wrote: Put sticky targets on the outside of the windows, put another facing inside at the same location, use a pr...
leegreen, post: 413157, member: 2332 wrote: Are any of the stairs wells open rails? Is there a center open area that is visible down to bottom floor?A...
Rather be reading than writing this thread @ this point!
Brad Ott, post: 413113, member: 197 wrote: Yikes!T&M?It is a "do not exceed" budget. Think they'll only have enough to do 1/4 of the job.
Bill93, post: 413058, member: 87 wrote: Please educate me. If the structure is complete and this is an interior renovation, what is it that needs car...
party chef, post: 413010, member: 98 wrote: I would take a look at the standpipe, perhaps there is a plumb line of site there, maybe a mail shoot. Sti...
mvanhank222, post: 412985, member: 8673 wrote: If you have time try poking around on Leicas website if I remember there were some articles about alter...
party chef, post: 412983, member: 98 wrote: Perhaps you can push for control of the elevators during off hours in order to do the work.Elevators are a...