Activity
 
Notifications
Clear all
geoguy27
@geoguy27
Registered
Joined: Apr 2, 2018
Topics: 1 / Replies: 4
Reply
RE: Creating RFP for control benchmarks for layout.

Posted by: R.J. Schneider Trying to imagine whether you're building this from the ground up, or matching an existing facility. If this were an existin...

7 years ago
Reply
RE: Creating RFP for control benchmarks for layout.

My layout crew is dialed in. We are not allowed to set control to come off of though as we are not a licensed firm. So when I have them setup on surve...

7 years ago
Reply
RE: Creating RFP for control benchmarks for layout.

In the past I have done network control surveys were I had to carry control from a BM nearly 1500' from our work area, run a closed loop through a net...

7 years ago
Reply
RE: Creating RFP for control benchmarks for layout.

I recall on one project them having a base setup near by for sure. On others I can't speak to their techniques. In all honestly, I can't say for sure ...

7 years ago
Topic